Lesson 1 — errors, exceptions, and try/catch/throw

← Module home · Lesson 2 — Custom exceptions and safety →

In this lesson you will learn

1. Error vs exception — two words, two jobs

An error is a condition: the user typed abc where a number belonged; a file is missing; a denominator is zero. Errors exist whether or not you have any machinery to report them.

An exception is C++’s machinery for announcing an error upward — a throw creates an exception object, the language carries it up the call stack, and a matching catch receives it.

The course’s first fifteen units handled errors with return codes and guards — and that was honest, because those tools are the right answer at the program’s edge:

// The validation-suite pattern (functions labs, Unit 07) — still the first line of defence:
int readIntInRange(int lo, int hi) {
    int x;
    while (!(cin >> x) || x < lo || x > hi) {   // detect
        if (!cin) { cin.clear(); cin.ignore(1000, '\n'); }  // repair
        cout << "Enter a number " << lo << "-" << hi << ": ";
    }
    return x;
}

So when does an error need the exception machinery instead? When the function that detects the problem cannot fix it, and its caller’s caller’s caller is the one that can. Return codes must climb hand-to-hand through every intermediate layer — each of which has to remember to check and forward them. An exception climbs by itself, through layers that do not need to care.

  Return code / guard Exception
Detected by if at the boundary throw anywhere below
Travels by hand, layer by layer automatically, up the stack
Ignorable? Yes — silently (the failure mode this module exists to kill) No — an uncaught exception stops the program loudly
Best for expected, handle-it-here conditions (user re-entry) unexpected-but-planned-for failures (missing file, bad data mid-parse)

2. The anatomy: try, catch, throw

#include <iostream>
#include <string>
#include <stdexcept>
using namespace std;

// 01_anatomy.cpp — the three keywords, one story.
// Compile: g++ -std=c++17 -Wall -Wextra 01_anatomy.cpp -o anatomy

double divide(int top, int bottom) {
    if (bottom == 0)
        throw invalid_argument("divide: bottom is zero");  // 1. announce
    return (double)top / bottom;                            // 2. never reached when throwing
}

int main() {
    int a = 10, b = 0;
    try {                                        // 3. the guarded zone
        cout << divide(a, b) << "\n";
        cout << "unreachable when the throw fires\n";
    }
    catch (const invalid_argument& e) {          // 4. the reception desk
        cout << "caught: " << e.what() << "\n";  // 5. what() = the message
    }
    cout << "main continues normally\n";         // 6. life after the catch
}

Reading it line by line:

Output:

caught: divide: bottom is zero
main continues normally

Note what is missing: unreachable when the throw fires never printed. The throw didn’t just report — it vacated the rest of the try block and flew out of divide.

3. Stack unwinding — what happens between throw and catch

The exception doesn’t teleport. It walks up the call stack, and at each level it runs that level’s cleanup:

main ─► loadAndAverage ─► parseLine ─► stoi("abc")  ← throw!
                                          │
        cleanup: locals destroyed ────────┤  (in reverse order of creation)
        cleanup: locals destroyed ────────┤
catch in main ─────────────────────────────┘

Two facts to carry for the rest of your programming life:

  1. Only automatic (stack) variables get destroyed. This is the RAII idea from the pointers and STL modules made life-or-death: a vector, string, or unique_ptr local cleans itself up during unwinding for free. A raw new without an owner leaks — the Debugging module’s leak rule, now with a second way to spring it (see debugging hunt D7).
  2. Unwinding skips normal control flow — no returns, no loops finishing, no couts in between. Code that “must always run” (flushing a log, closing a display) cannot sit after the throwing call; it must live in an object’s destructor or a catch.

4. The standard exception family

The standard library ships a hierarchy rooted at exception (all in <stdexcept> unless noted):

Exception Thrown by / for Typical catch response
std::exception the root — catch it as a last-resort net log, apologise, stop gracefully
std::runtime_error errors detectable only at run time (you usually derive your own from here) report and recover or abort
std::logic_error programmer errors: broken preconditions fix the code, not the data
std::invalid_argument a parameter was unacceptable (stoi("abc") throws this) report the bad value
std::out_of_range index/key access outside bounds (vector::at, map::at) report, maybe retry
std::bad_alloc (in <new>) new could not allocate memory free something, or stop
std::ios_base::failure (in <ios>) stream failure when exceptions are enabled on a stream rare by default — streams report via state, Lesson 2 explains why

Two habits, from the STL module’s at()-vs-[] lesson: the checking accessors throw these; the fast ones (operator[], front, back) have no contract to check and produce undefined behaviour instead. The exception family only protects code that chose to check.

And one naming honesty note: logic_error for “the caller broke the contract” vs runtime_error for “the world misbehaved” is the split professionals argue about — in this course, derive domain failures from runtime_error and leave logic_error for genuinely impossible-by-construction states.

5. Multiple catches, catch order, and the elipses net

try {
    process(id);                       // may throw out_of_range or invalid_argument
}
catch (const out_of_range& e) {        // most derived FIRST
    cerr << "bad id: " << e.what() << "\n";
}
catch (const exception& e) {           // the family net comes AFTER
    cerr << "unexpected: " << e.what() << "\n";
}

Rules the compiler will not warn you about:

6. Robust input: connecting to the validation suite

Here is the connection this lesson promises. The validation-suite readers from the functions labs and the exception machinery are not competing designs — they are the two layers of one defence:

// The BOUNDARY (unchanged from Unit 07): expected mistakes, handled locally.
int readIntInRange(int lo, int hi) {
    int x;
    while (!(cin >> x) || x < lo || x > hi) {
        if (!cin) { cin.clear(); cin.ignore(1000, '\n'); }
        cout << "Enter a number " << lo << "-" << hi << ": ";
    }
    return x;
}

// The DEPTHS (new): unexpected-but-planned-for failures, announced upward.
vector<int> loadMarks(const string& path) {
    ifstream in(path);
    if (!in) throw runtime_error("loadMarks: cannot open " + path);
    vector<int> marks;
    string line;
    while (getline(in, line)) {
        if (line.empty()) continue;
        try {
            marks.push_back(stoi(line));       // may throw invalid_argument
        } catch (const invalid_argument&) {
            throw runtime_error("loadMarks: non-numeric line in " + path + ": " + line);
        }
    }
    return marks;
}

The division of labour, in one table:

Situation Tool Why
User types abc at a menu (expected, every session) guard + re-prompt loop handle-it-here; no reason to escalate
Marks file missing (unexpected, but the app knows what to do) throw runtime_error from the loader the loader can’t choose; the app can (fresh start vs abort)
Malformed line mid-file (corrupt data) catch-and-rethrow-with-context stoi’s invalid_argument says “abc” but not which file, which line — add that, then rethrow
No marks loaded at all validate-before-use guard if the vector is empty, refuse before dividing by marks.size()

The third row — rethrow with context — is the quiet professional habit in this lesson: low-level exceptions often say what but not where; catch, enrich, rethrow, and the higher layer finally has a report worth showing.

7. The pre-exception lesson, restated

If you take one sentence from this lesson: the guards you already write are not beginners’ exceptions — they are the first line of defence, and exceptions are the second. A menu that re-prompts should never throw; a file loader that cannot open its file should never return quietly.

Recap

Practice

  1. Modify 01_anatomy.cpp to call divide twice — once with b = 0, once with b = 3 — inside one try. Predict the output, then run. Which parts ran, which didn’t, and why?
  2. Add a catch (...) after the specific handler and throw a plain int (throw 42;) from a new function. What does the net catch, and what can it report?
  3. Extend loadMarks to also catch out_of_range (a line longer than stoi can parse) and rethrow with the line number. Hint: getline calls can count.

→ Continue to Lesson 2 — custom exceptions and exception safety.

— Engr. Dr. Muhammad Nadeem Majeed, Professor, Department of Data Science (PUCIT), University of the Punjab, Lahore · About the instructor