Records Debugging Exercises (10)

← Module home · Work each in the debugging protocol: reproduce → form hypotheses → instrument → fix → reflect. Records add a first step: re-read the struct definition — most record bugs are a lie between the schema and the code that uses it.

Format. Each snippet compiles (unless stated) but misbehaves. Hint ladders are collapsible — one rung at a time. Fix-list summary at the end.


D1 — The error that isn’t here (missing semicolon)

struct Student {
    std::string name;
    int score;
}                                   // ← nothing wrong on THIS line, says the compiler

int main() {
    Student a = {"Ali", 78};
    std::cout << a.name << '\n';
}
// Compiler: error: expected ';' after struct definition (or something stranger, later)
Hint 1 — which line does the compiler report, and which line is guilty?

The struct definition needs a closing semicolon: };. The compiler only notices at the next construct — the error location is a clue, not a confession.

Hint 2 — the habit

Read }; as one token when writing types — brace, brace-semicolon — and when an error points after a struct, look up at the definition first.

Reflection. Struct-definition errors report downstream. The schema is the first suspect whenever the scene of the reported crime makes no sense.

D2 — The arrow that wasn’t (dot/arrow confusion)

void bumpScore(Student* s) {
    s.score += 5;        // error: member reference type 'Student *' is not a structure
}
Hint 1 — what does s hold: the record, or the address of one?

The address. s.score asks an address for a member — type error. Through a pointer you follow first: s->score += 5; (or the noisy (*s).score += 5;).

Reflection. One question resolves every access: do I hold the record or the address of one? Record → dot; address → arrow. (Lesson 2 §1)

D3 — The swapped birthday (positional braces)

struct Date { int y; int m; int d; };
struct Employee {
    std::string name;
    Date        hired;
    double      salary;
};

int main() {
    Employee e = {"Sana Mir", {2024, 3, 15}, 85000.0};   // intended: hired 15 March 2024
    std::cout << e.hired.y << '-' << e.hired.m << '-' << e.hired.d << '\n';
}
// Prints: 2024-3-15  — but the intent was d=15, m=3... is it right? Now change intent:
Employee f = {"Sana Mir", {15, 3, 2024}, 85000.0};       // "15/3/2024" — what did this BUILD?

The second record compiles silently and is garbage.

Hint 1 — what does the nested brace list bind to?

Position, in declaration order: Date { y, m, d } — so {15, 3, 2024} built year 15, month 3, day 2024. No error, no warning — just a record that lies (Lesson 1 §4).

Hint 2 — the two defences

Validate (isValid from E11 rejects year 15 immediately) and prefer member assignment for wide records: f.hired.y = 2024; f.hired.m = 3; f.hired.d = 15; — every value beside its name.

Reflection. Brace lists bind by position, never by name — the schema’s order is the list’s meaning. Wide records get member assignment; every record gets validation.

D4 — The zero that passed (uninitialized + partial fill)

struct Attempt {
    std::string name;
    int score;
    int items;      // number of questions — set at creation!
};

Attempt readAttempt() {
    Attempt a = {"Ali"};          // quick partial fill...
    std::cout << "score: ";
    std::cin >> a.score;
    return a;                      // a.items is... ?
}
// later: double pct = 100.0 * a.score / a.items;   // division by... what?
Hint 1 — what does a partial brace list do to missing members?

Zeroes them — silently. items is 0, looks legitimate, and detonates at the division (gallery G6).

Hint 2 — the fix, and the design question

Complete the fill (a.items read and validated like score), or use full member assignment so no member is forgotten. Design question: if items is always 5 for this quiz, does it belong as a per-record field at all — or is it a constant?

Reflection. Zero-initialized means “quietly wrong”, not “safely empty”. Every field either gets a real value or a documented sentinel.

D5 — The laundered state (enum input trap)

enum class Status { ACTIVE, FROZEN, GRADUATED };

int main() {
    int code;
    std::cin >> code;                                  // user types 9
    Status st = static_cast<Status>(code);             // compiles!
    switch (st) {
        case Status::ACTIVE:     std::cout << "active\n"; break;
        case Status::FROZEN:     std::cout << "frozen\n"; break;
        case Status::GRADUATED:  std::cout << "graduated\n"; break;
    }
    std::cout << "done\n";
}
// Input 9 → prints only "done". No case matched. No error. The record now carries state 9.
Hint 1 — is static_cast a validator?

No — it’s a launderer. It converts any int to the enum type, including values no member has. The switch then matches nothing, silently.

Hint 2 — the cure (two forms)

Validate-then-cast (if (code < 0 || code > 2) reject;) or map through a menu function (pickStatus) so only real members are ever produced (Lesson 3 §4).

Reflection. A cast changes the type, never the truth. Enum inputs cross a validation gate or they don’t cross.

D6 — The ghost of parallel arrays (partial swap)

struct Item { std::string name; int qty; };

void restock(Item shelf[], int n) {
    // move the last item to the front, "efficiently":
    Item last = shelf[n - 1];
    for (int i = n - 1; i > 0; i = i - 1)
        shelf[i] = shelf[i - 1];
    shelf[0] = last;           // ← but the author ALSO keeps a legacy parallel array:
    // prices[0] = prices[n-1]; ... forgot to rotate it!
}

Symptom: after restocking, item names/quantities rotate but the prices array still lines up with the old order — records lie by half.

Hint 1 — which two facts must always move together, and what structure guarantees that?

A record’s fields. The parallel prices[] array is the drift surface the struct was invented to kill — keep price inside Item and the rotation moves it for free.

Hint 2 — the deeper fix

Delete the parallel array; migrate the field into the record (Lesson 1 §5). Any “second array that must move in lockstep” is the ghost of the old design.

Reflection. If two datasets must change together, they are one dataset. The struct is the type-system way of saying so.

D7 — The copy that fooled the test (by-value mutation)

void enrollLate(Student s) {      // intended: add 5 late-penalty to the record
    s.score -= 5;
}

int main() {
    Student a = {"Ali", 78};
    enrollLate(a);
    std::cout << a.score << '\n';   // prints 78 — the penalty vanished
}
Hint 1 — what crossed the call?

A copy (Lesson 2 §1). s.score -= 5 penalized the copy; the original never knew.

Hint 2 — the fix

void enrollLate(Student& s) — the alias modifies the caller’s record. (The compiler can’t catch this one — a value parameter is legal; only the intent is wrong. This is why the door choice is a design decision, not syntax trivia.)

Reflection. “It compiled and ran” is not a pass. Only the test table (expected 73, actual 78) catches a door taken by mistake.

D8 — The nested nobody (unvalidated nested record)

struct Patient { int id; std::string name; Date admitted; bool critical; };

Patient readPatient() {
    Patient p;
    std::cout << "id: ";   std::cin >> p.id;
    std::cin.ignore(1000, '\n');
    std::cout << "name: "; std::getline(std::cin, p.name);
    std::cout << "critical: "; std::cin >> p.critical;
    // admitted: never read!
    return p;
}

Later: the ward report prints admitted 0-0-0 — a record whose nested member is all zeros, looking almost legitimate.

Hint 1 — which member never got a real value, and what does it hold?

admitted — a Date of zeros. Nested members don’t initialize themselves (gallery G3).

Hint 2 — the fix

p.admitted = readDate(); — route the nested record through its validating factory (Lesson 2 §2). Construction goes through checkpoints — all of them, nested included.

Reflection. Every member, at every depth, gets a real value through a validating door. Zeros in a date are a design smell, not a default.

D9 — The leaky catalogue (returned-handle confusion)

// The author wants a function that "finds the cheapest book":
Book* cheapest(Book shelf[], int n) {
    int best = 0;
    for (int i = 1; i < i; i = i + 1)          // (typo'd loop — also find this!)
        if (shelf[i].price < shelf[best].price) best = i;
    return &shelf[best];
}

int main() {
    Book shelf[3] = { /* ... */ };
    Book* c = cheapest(shelf, 3);
    delete c;              // ← the real crime
}

Two bugs are planted. Find both before reading the hints.

Hint 1 — who owns shelf's memory?

main does — shelf is a stack array. delete c; releases a slice of a non-heap block: undefined behaviour. A pointer into someone else’s array is a borrowed view, never a deletion ticket (ownership).

Hint 2 — and the loop?

i < i — always false, so the loop never runs and best stays 0: the “cheapest” is always the first book. Two lessons: i < n (the classic), and — bigger — for a value question (“which book is cheapest?”), return the record, not a pointer (E13’s rule): Book cheapest(...).

Reflection. Pointers returned from searches point into existing data — they are views, not owners. And value questions deserve value returns.

D10 — The enum that printed a number

enum class Level { BEGINNER, INTERMEDIATE, ADVANCED };

int main() {
    Level l = Level::INTERMEDIATE;
    std::cout << "level: " << l << '\n';    // prints "level: 1"
}

Expected (by the author): “intermediate”. Observed: 1.

Hint 1 — what does the compiler know an enum to be?

An integer in a costume. cout prints the underlying value — the name exists only in your source code, not at runtime.

Hint 2 — the fix, and why it's a feature

Write the bridge: std::cout << "level: " << levelText(l) << '\n'; (Lesson 3 §2). The bridge function is your single point of naming truth — add a member, update one function.

Reflection. Enum names live in source, not in memory. Every enum that faces a human gets a xText() bridge; every bridge gets one home.


Fix-list summary

D Bug (one line) Fix (one line)
D1 }; missing on the struct read }; as one token; look up at the schema when errors point low
D2 .score through a pointer s->score
D3 positional brace list built a lying Date member assignment + isValid gate
D4 partial brace list zeroed items complete fill or documented sentinel — every field, real value
D5 cast laundered 9 into Status validate-then-cast / menu mapper
D6 parallel price array left behind by the rotation move the field into the record — one dataset
D7 by-value parameter mutated a copy Student& when the callee must modify
D8 nested admitted never read route every nested member through its factory
D9 delete on a borrowed view (+ i < i) views aren’t owners; value questions return values
D10 enum printed as its integer the xText() bridge function