Intermediate tier — I-01 to I-40

Units first: Stage C — Structure (arrays, strings, functions, records). Attempt protocol: unchanged — and now the samples must include one boundary case you invent yourself.

Part 1 — Arrays and collections (I-01…I-12)

I-01 — Fill, then analyze

Difficulty: ★★ · Topics: arrays, input, traversal

Read n (1–100) then n integers into an array. Print them reversed on one line, then their sum.

Input: n, then n integers (−1000…1000). Output: reversed line, then sum: S. Sample tests: 4 1 2 3 4 → 4 3 2 1 / sum: 10 Hints: ① fill in one loop, print in a second, downward loop. Reference solution

#include <iostream>
using namespace std;
int main() {
    int n, a[100];
    cin >> n;
    for (int i = 0; i < n; i++) cin >> a[i];
    for (int i = n - 1; i >= 0; i--) cout << a[i] << " \n"[i == 0];
    long long sum = 0;
    for (int i = 0; i < n; i++) sum += a[i];
    cout << "sum: " << sum << "\n";
    return 0;
}

Explanation: the fill-then-two-passes shape is the array baseline; " \n"[i == 0] prints a space between items and a newline after the last — a neat, honest trick worth meeting early (a plain if also works). Distinct idea: passes over stored data.


I-02 — Maximum and its position

Difficulty: ★★ · Topics: arrays, extremes, indices

Read n (1–100) then n distinct integers. Print the maximum and its 0-based index.

Input: n, then n integers (−10⁶…10⁶). Output: max: M at: I. Sample tests: 5 8 3 9 1 9 — invalid (distinct), use 5 8 3 9 1 4 → max: 9 at: 2 Hints: ① track index alongside the max — update both together. Reference solution

#include <iostream>
using namespace std;
int main() {
    int n, a[100];
    cin >> n;
    for (int i = 0; i < n; i++) cin >> a[i];
    int best = 0;
    for (int i = 1; i < n; i++) if (a[i] > a[best]) best = i;
    cout << "max: " << a[best] << " at: " << best << "\n";
    return 0;
}

Explanation: storing the index of the best rather than the best value is the small reframing that makes position reporting free — and it’s the shape that later becomes max_element (C-11). Distinct idea: index as the artifact.


I-03 — Count above average

Difficulty: ★★ · Topics: arrays, averages, two-pass

Read n (1–100) then n integers. Print the average (two decimals) and how many elements are strictly above it.

Input: n, then n integers. Output: avg: X above: K. Sample tests: 5 10 20 30 40 50 → avg: 30.00 above: 2 Hints: ① pass 1 sums; pass 2 counts — you need the array because the average arrives after the data. Reference solution

#include <iostream>
#include <iomanip>
using namespace std;
int main() {
    int n, a[100];
    cin >> n;
    long long sum = 0;
    for (int i = 0; i < n; i++) { cin >> a[i]; sum += a[i]; }
    double avg = (double)sum / n;
    int above = 0;
    for (int i = 0; i < n; i++) if (a[i] > avg) above++;
    cout << fixed << setprecision(2) << "avg: " << avg << " above: " << above << "\n";
    return 0;
}

Explanation: the two-pass pattern exists because storage lets you look again — a streaming version is impossible without keeping the values. Distinct idea: why storage enables second looks.


I-04 — In-place reverse (two-pointer)

Difficulty: ★★★ · Topics: arrays, two pointers, in-place

Read n (1–100) then n integers. Reverse the array in place (no second array) and print it.

Input: n, then n integers. Output: the reversed line. Sample tests: 5 1 2 3 4 5 → 5 4 3 2 1 Hints: ① two indices walk toward the middle, swapping as they go; ② stop when they meet. Reference solution

#include <iostream>
using namespace std;
int main() {
    int n, a[100];
    cin >> n;
    for (int i = 0; i < n; i++) cin >> a[i];
    for (int lo = 0, hi = n - 1; lo < hi; lo++, hi--) {
        int t = a[lo]; a[lo] = a[hi]; a[hi] = t;
    }
    for (int i = 0; i < n; i++) cout << a[i] << " \n"[i == n - 1];
    return 0;
}

Explanation: the two-pointer swap — half the moves of a full pass, zero extra memory — is the in-place idiom behind reverse, palindrome checks, and partitioning later. Distinct idea: converging indices.


I-05 — Rotate right by k

Difficulty: ★★★ · Topics: arrays, index arithmetic, modular thinking

Read n (1–100), k (0–100), then n integers. Print the array rotated right by k (the last k elements move to the front).

Input: n, k, then n integers. Output: the rotated line. Sample tests: 5 2 1 2 3 4 5 → 4 5 1 2 3 · 3 0 7 8 9 → 7 8 9 Hints: ① element at old index i lands at new index (i + k) % n — or read it backwards: new position j comes from old (j − k + n) % n. Reference solution

#include <iostream>
using namespace std;
int main() {
    int n, k, a[100], b[100];
    cin >> n >> k;
    k %= n;                                  // k may exceed n
    for (int i = 0; i < n; i++) cin >> a[i];
    for (int i = 0; i < n; i++) b[(i + k) % n] = a[i];
    for (int i = 0; i < n; i++) cout << b[i] << " \n"[i == n - 1];
    return 0;
}

Explanation: modular index arithmetic turns rotation into one assignment formula — no shifting loops, no special cases for the wrap. The k %= n guard is the boundary habit. Distinct idea: % n as the wraparound operator.


I-06 — Second largest without sorting

Difficulty: ★★★ · Topics: arrays, extremes, single pass

Read n (2–100) then n integers (may contain duplicates of values but the two largest positions differ). Print the second largest distinct value; if all values are equal, print NONE.

Input: n, then n integers (−10⁶…10⁶). Output: one integer or NONE. Sample tests: 5 3 9 1 9 4 → 4 · 3 7 7 7 → NONE · 2 5 5 → NONE Hints: ① track best and secondBest; ② a value equal to best must not demote secondBest. Reference solution

#include <iostream>
using namespace std;
int main() {
    int n, a[100];
    cin >> n;
    for (int i = 0; i < n; i++) cin >> a[i];
    long long best = a[0], second = LLONG_MIN;
    bool haveSecond = false;
    for (int i = 1; i < n; i++) {
        if (a[i] > best)        { second = best; haveSecond = true; best = a[i]; }
        else if (a[i] < best && (a[i] > second || !haveSecond)) { second = a[i]; haveSecond = true; }
    }
    if (haveSecond) cout << second << "\n";
    else            cout << "NONE\n";
    return 0;
}

Explanation: the three cases — bigger, smaller, equal — each get explicit treatment; the equal case is precisely what makes this problem distinct from Ba-02’s plain max. LLONG_MIN + a boolean is the honest “no second yet” encoding. Distinct idea: extremes with a duplicate-aware runner-up.


I-07 — Merge two sorted arrays

Difficulty: ★★★ · Topics: arrays, merge, two pointers

Read n, then n sorted integers; read m, then m sorted integers. Merge into one sorted line without sorting again.

Input: n (1–50), n sorted ints; m (1–50), m sorted ints (−10⁶…10⁶). Output: the merged line. Sample tests: 3 1 4 9 + 3 2 3 10 → 1 2 3 4 9 10 Hints: ① i and j walk the two arrays; ② always emit the smaller head; ③ drain leftovers after either runs out. Reference solution

#include <iostream>
using namespace std;
int main() {
    int n, m, a[50], b[50];
    cin >> n;
    for (int i = 0; i < n; i++) cin >> a[i];
    cin >> m;
    for (int j = 0; j < m; j++) cin >> b[j];
    int i = 0, j = 0;
    bool firstOut = true;
    while (i < n || j < m) {
        long long take;
        if (i < n && (j >= m || a[i] <= b[j])) take = a[i++];
        else                                    take = b[j++];
        if (!firstOut) cout << " ";
        cout << take;
        firstOut = false;
    }
    cout << "\n";
    return 0;
}

Explanation: the merge walk is the heart of merge sort (A-30 uses it) and the classic “two pointers, one output” pattern. The <= keeps the merge stable — equal elements keep their source order. Distinct idea: consuming two sorted streams.


I-08 — Remove duplicates, keep first order

Difficulty: ★★★ · Topics: arrays, membership, compaction

Read n (1–100) then n integers. Print the values with duplicates removed, keeping first-appearance order.

Input: n, then n integers (−10⁶…10⁶). Output: the compacted line. Sample tests: 6 4 2 4 3 2 9 → 4 2 3 9 Hints: ① build a result array; before inserting, scan what’s already there; ② track the result length separately. Reference solution

#include <iostream>
using namespace std;
int main() {
    int n, a[100], out[100], m = 0;
    cin >> n;
    for (int i = 0; i < n; i++) cin >> a[i];
    for (int i = 0; i < n; i++) {
        bool seen = false;
        for (int j = 0; j < m; j++) if (out[j] == a[i]) { seen = true; break; }
        if (!seen) out[m++] = a[i];
    }
    for (int i = 0; i < m; i++) cout << out[i] << " \n"[i == m - 1];
    return 0;
}

Explanation: the keep-first compaction with a separate output length — the same structure as the later set-based version (C-08), where the container replaces the inner scan. Writing both is the point. Distinct idea: grow-a-result-with-membership-checks.


I-09 — Frequency table of an array

Difficulty: ★★ · Topics: arrays, counting, bounded values

Read n (1–200) then n integers, each in 0–50 inclusive. Print each distinct value (ascending) with its count.

Input: n, then n integers (0…50). Output: value: v count: c per distinct value. Sample tests: 6 3 1 3 0 3 1 → value: 0 count: 1 / value: 1 count: 2 / value: 3 count: 3 Hints: ① a count array cnt[51] indexed by value; ② the bounded range is what makes direct indexing possible. Reference solution

#include <iostream>
using namespace std;
int main() {
    int n, cnt[51] = {0};
    cin >> n;
    for (int i = 0; i < n; i++) { int x; cin >> x; cnt[x]++; }
    for (int v = 0; v <= 50; v++)
        if (cnt[v] > 0) cout << "value: " << v << " count: " << cnt[v] << "\n";
    return 0;
}

Explanation: direct-indexed counting — O(n + 51) — works only because values are bounded; the constraint line is the algorithm’s license. Unbounded values force the Ba-16-style pairing or the map (C-10). Distinct idea: the value as the index.


I-10 — Longest run of equal values

Difficulty: ★★★ · Topics: arrays, runs, state machines

Read n (1–100) then n integers. Print the value with the longest consecutive run and that run’s length.

Input: n, then n integers. Output: value: V run: L. Sample tests: 7 5 5 3 3 3 5 1 → value: 3 run: 3 · 1 4 4 → value: 4 run: 2 — input 3 1 4 4 → value: 4 run: 2 Hints: ① keep current value + current run + best value + best run; ② equal to current → extend; else → reset. Reference solution

#include <iostream>
using namespace std;
int main() {
    int n, a[100];
    cin >> n;
    for (int i = 0; i < n; i++) cin >> a[i];
    int curVal = a[0], curRun = 1, bestVal = a[0], bestRun = 1;
    for (int i = 1; i < n; i++) {
        if (a[i] == curVal) curRun++;
        else { curVal = a[i]; curRun = 1; }
        if (curRun > bestRun) { bestRun = curRun; bestVal = curVal; }
    }
    cout << "value: " << bestVal << " run: " << bestRun << "\n";
    return 0;
}

Explanation: run-length tracking is a two-state machine (extend/reset) with a promotion rule — the same skeleton as the word-frequency run problems and the temperature station’s longest cold spell. Distinct idea: current-vs-best state pairs.


I-11 — Matrix row and column sums

Difficulty: ★★ · Topics: arrays, matrices, nested loops

Read r, c (1–10 each) then r×c integers row by row. Print each row’s sum, then each column’s sum, labeled.

Input: r, c, then the grid. Output: row i: S lines then col j: S lines. Sample tests: 2 3 1 2 3 4 5 6 → row 0: 6 row 1: 15 col 0: 5 col 1: 7 col 2: 9 Hints: ① row sums: inner loop over the row; ② column sums: swap the loop order — outer j, inner i. Reference solution

#include <iostream>
using namespace std;
int main() {
    int r, c, g[10][10];
    cin >> r >> c;
    for (int i = 0; i < r; i++)
        for (int j = 0; j < c; j++)
            cin >> g[i][j];
    for (int i = 0; i < r; i++) {
        int s = 0;
        for (int j = 0; j < c; j++) s += g[i][j];
        cout << "row " << i << ": " << s << "\n";
    }
    for (int j = 0; j < c; j++) {
        int s = 0;
        for (int i = 0; i < r; i++) s += g[i][j];
        cout << "col " << j << ": " << s << "\n";
    }
    return 0;
}

Explanation: transposing the loops (not the data) produces column sums — g[i][j] visited in both orders is the matrix-traversal lesson in its purest form. Distinct idea: loop order as data access order.


I-12 — Diagonal difference (square matrix)

Difficulty: ★★★ · Topics: arrays, matrices, index relationships

Read n (2–10) then an n×n grid. Print the absolute difference between the main-diagonal sum and the anti-diagonal sum.

Input: n, then the grid (−100…100). Output: one integer. Sample tests: 3 1 2 3 4 5 6 7 8 9 → 0 (1+5+9 = 15; 3+5+7 = 15) · n=2 grid 1 2 3 4 → 2 (1+4 − (2+3)) Hints: ① main diagonal: i == j; ② anti-diagonal: i + j == n − 1. Reference solution

#include <iostream>
using namespace std;
int main() {
    int n, g[10][10];
    cin >> n;
    for (int i = 0; i < n; i++)
        for (int j = 0; j < n; j++)
            cin >> g[i][j];
    long long main_sum = 0, anti = 0;
    for (int i = 0; i < n; i++) {
        main_sum += g[i][i];
        anti     += g[i][n - 1 - i];
    }
    long long diff = main_sum - anti;
    if (diff < 0) diff = -diff;
    cout << diff << "\n";
    return 0;
}

Explanation: two index relationships — i == j and i + j == n − 1 — define the diagonals without any special-cased loops. Index algebra over matrices is the skill; the center cell of odd-n matrices lands on both, which is fine here (it’s added to both sums). Distinct idea: diagonal index identities.


Part 2 — Strings (I-13…I-24)

I-13 — getline after cin, done right

Difficulty: ★★★ · Topics: strings, cin/getline mixing, buffer

Read an integer n, then n full lines of text. Echo each line numbered.

Input: n (1–5), then n lines (each up to 100 chars, may contain spaces). Output: 1: line1 etc. Hints: ① after cin >> n, the newline is still in the buffer — one cin.ignore() before the getline loop. Reference solution

#include <iostream>
#include <string>
using namespace std;
int main() {
    int n;
    cin >> n;
    cin.ignore();                       // eat the newline left by >>
    for (int i = 1; i <= n; i++) {
        string line;
        getline(cin, line);
        cout << i << ": " << line << "\n";
    }
    return 0;
}

Explanation: the mixing trap in its canonical fix — the ignore’s placement (once, before the loop) is the whole exercise; inside the loop it would eat each line’s first character. Distinct idea: the buffer as state between reads.


I-14 — Case flip

Difficulty: ★★ · Topics: strings, traversal, cctype

Read one line; print it with every letter’s case flipped (others unchanged).

Input: one line, up to 200 chars. Output: the flipped line. Sample tests: Code Buff 2026! → cODE bUFF 2026! Hints: ① isupper/islower + tolower/toupper from <cctype>; ② build a result or modify in place. Reference solution

#include <iostream>
#include <string>
#include <cctype>
using namespace std;
int main() {
    string s;
    getline(cin, s);
    for (size_t i = 0; i < s.size(); i++) {
        if (isupper(s[i]))      s[i] = tolower(s[i]);
        else if (islower(s[i])) s[i] = toupper(s[i]);
    }
    cout << s << "\n";
    return 0;
}

Explanation: in-place character transformation with a classification-then-act ladder — the digits and punctuation in the sample prove the else-chain leaves them alone. Distinct idea: conditional per-character rewrite.


I-15 — Word reverser (order of words preserved)

Difficulty: ★★★ · Topics: strings, splitting, traversal

Read one line of space-separated words (single spaces, no leading/trailing spaces). Print the words in reverse word order on one line.

Input: one line, up to 200 chars. Output: one line. Sample tests: the quick brown fox → fox brown quick the Hints: ① store words in a string words[50] while scanning; ② a word ends at a space or end-of-line. Reference solution

#include <iostream>
#include <string>
using namespace std;
int main() {
    string line, words[50];
    getline(cin, line);
    int count = 0;
    string cur = "";
    for (size_t i = 0; i <= line.size(); i++) {
        if (i == line.size() || line[i] == ' ') {
            if (!cur.empty()) words[count++] = cur;
            cur = "";
        } else {
            cur += line[i];
        }
    }
    for (int i = count - 1; i >= 0; i--) cout << words[i] << " \n"[i == 0];
    return 0;
}

Explanation: the manual word scanner — accumulate until a boundary, flush, repeat — is hand-rolled tokenization, the same loop a later istringstream or stringstream version replaces. Writing it once makes the library version mean something. Distinct idea: scanning with a flush rule.


I-16 — Palindrome line (letters only, case-blind)

Difficulty: ★★★ · Topics: strings, two pointers, normalization

Read one line. Consider only letters (ignore digits, spaces, punctuation), case-insensitively. Print PALINDROME or NOT.

Input: one line, up to 200 chars. Output: one word. Sample tests: Madam, I'm Adam! → PALINDROME · Hello → NOT Hints: ① normalize: keep tolower’d letters in a new string; ② two-pointer compare, or compare with its reverse. Reference solution

#include <iostream>
#include <string>
#include <cctype>
using namespace std;
int main() {
    string raw, clean;
    getline(cin, raw);
    for (size_t i = 0; i < raw.size(); i++)
        if (isalpha(raw[i])) clean += tolower(raw[i]);
    for (size_t lo = 0, hi = clean.size(); lo < hi; lo++, hi--) {
        if (clean[lo] != clean[hi - 1]) { cout << "NOT\n"; return 0; }
    }
    cout << "PALINDROME\n";
    return 0;
}

Explanation: normalize-then-check splits the problem into two easy halves — the same decomposition discipline as the functions module. The two-pointer scan (I-04’s idiom on characters) halves the comparisons. Distinct idea: normalization before property testing.


I-17 — Vowel/consonant report with positions

Difficulty: ★★ · Topics: strings, classification, reporting

Read one word (letters only). Print its vowel positions (0-based) on one line, then counts: vowels: v consonants: c.

Input: one word, 1–50 chars, letters only. Output: positions line (space-separated) then the count line. Sample tests: Education → 0 4 6 7 / vowels: 4 consonants: 5 Hints: ① test lowercase via tolower; ② print positions as you find them (separator discipline from I-01). Reference solution

#include <iostream>
#include <string>
#include <cctype>
using namespace std;
int main() {
    string w;
    cin >> w;
    int v = 0, c = 0;
    bool first = true;
    for (size_t i = 0; i < w.size(); i++) {
        char t = tolower(w[i]);
        if (t=='a'||t=='e'||t=='i'||t=='o'||t=='u') {
            if (!first) cout << " ";
            cout << i;
            first = false;
            v++;
        } else c++;
    }
    cout << "\nvowels: " << v << " consonants: " << c << "\n";
    return 0;
}

Explanation: classification plus position reporting in one pass — the positional scan that text-toolkit problems (search tools, highlighters) are built from. Distinct idea: positions as first-class output.


I-18 — Substring counter

Difficulty: ★★★ · Topics: strings, searching, nested loops

Read a text line and a pattern (both on separate lines, pattern ≤ 20 chars). Print how many times the pattern occurs — counting overlaps.

Input: text (≤ 200 chars), pattern (1–20 chars). Output: one integer. Sample tests: text aaaa, pattern aa → 3 · text abababab, pattern abab → 3 Hints: ① try every start position 0…text.size() − pat.size(); ② compare character by character. Reference solution

#include <iostream>
#include <string>
using namespace std;
int main() {
    string text, pat;
    getline(cin, text);
    getline(cin, pat);
    int count = 0;
    if (pat.size() <= text.size()) {
        for (size_t s = 0; s + pat.size() <= text.size(); s++) {
            bool match = true;
            for (size_t k = 0; k < pat.size(); k++)
                if (text[s + k] != pat[k]) { match = false; break; }
            if (match) count++;
        }
    }
    cout << count << "\n";
    return 0;
}

Explanation: the naive search loop — every start, every offset — is the honest baseline that makes find-in-a-loop (the course’s string module version) and KMP-level ideas legible later. The s + pat.size() <= text.size() bound is the off-by-one battleground. Distinct idea: overlapping occurrence counting.


I-19 — Caesar shift (letters only)

Difficulty: ★★★ · Topics: strings, modular arithmetic, cctype

Read a line and a shift k (0–25). Encrypt: letters shift forward k (wrapping Z→A), case preserved, others unchanged.

Input: one line (≤ 200 chars), then k. Output: the encrypted line. Sample tests: Attack at Z-5! with k=3 → Dwwdfn dw C-5! Hints: ① for lowercase: (c - 'a' + k) % 26 + 'a'; ② uppercase analog; ③ non-letters pass through. Reference solution

#include <iostream>
#include <string>
using namespace std;
int main() {
    string s;
    int k;
    getline(cin, s);
    cin >> k;
    for (size_t i = 0; i < s.size(); i++) {
        char c = s[i];
        if (c >= 'a' && c <= 'z')      s[i] = (c - 'a' + k) % 26 + 'a';
        else if (c >= 'A' && c <= 'Z') s[i] = (c - 'A' + k) % 26 + 'A';
    }
    cout << s << "\n";
    return 0;
}

Explanation: the normalize-to-alphabet-index trick — subtract the base, shift modulo 26, add the base back — is the idiom for letter arithmetic. % here is a range-clamper, not a remainder report: same operator, third job. Distinct idea: base-offset modular mapping.


I-20 — Initials and name length stats

Difficulty: ★★ · Topics: strings, getline, word starts

Read a full name (may contain multiple spaces between words? No — single spaces, no leading/trailing). Print initials in capitals separated by dots, then letters: N (letters only) and words: W.

Input: one line, e.g. muhammad ali jinnah. Output: M.A.J. / letters: 17 / words: 3 Hints: ① I-13-style word starts; ② isalpha filters letters from the length count. Reference solution

#include <iostream>
#include <string>
#include <cctype>
using namespace std;
int main() {
    string name;
    getline(cin, name);
    int letters = 0, words = 0;
    for (size_t i = 0; i < name.size(); i++) {
        if (isalpha(name[i])) letters++;
        bool isStart = name[i] != ' ' && (i == 0 || name[i-1] == ' ');
        if (isStart) {
            words++;
            cout << (char)toupper(name[i]);
            if (i != name.size() - 1) cout << ".";  // dot after every word's initial
        }
    }
    cout << "\nletters: " << letters << " words: " << words << "\n";
    return 0;
}

Explanation: one scan, three products (initials, letter count, word count) — multi-output single-pass processing, with the punctuation rule (dot after each initial, including the last) specified by the sample. Distinct idea: one scan, several reports.


I-21 — Digit words to digits

Difficulty: ★★ · Topics: strings, mapping, token processing

Read one line of English number words separated by spaces — zero…nine only. Print the digits they name as one integer string.

Input: one line, 1–12 words. Output: one line of digits. Sample tests: five zero seven → 507 Hints: ① compare each token against ten literals; ② accumulate into a result string with +=. Reference solution

#include <iostream>
#include <string>
using namespace std;
int main() {
    string line;
    getline(cin, line);
    string result = "";
    string cur = "";
    for (size_t i = 0; i <= line.size(); i++) {
        if (i == line.size() || line[i] == ' ') {
            if (cur == "zero")      result += '0';
            else if (cur == "one")  result += '1';
            else if (cur == "two")  result += '2';
            else if (cur == "three")result += '3';
            else if (cur == "four") result += '4';
            else if (cur == "five") result += '5';
            else if (cur == "six")  result += '6';
            else if (cur == "seven")result += '7';
            else if (cur == "eight")result += '8';
            else if (cur == "nine") result += '9';
            cur = "";
        } else {
            cur += line[i];
        }
    }
    cout << result << "\n";
    return 0;
}

Explanation: token-accumulate-classify — the word scanner from I-15 feeding a ten-way mapping. Building a result string (not arithmetic) is the difference from Ba-03’s numeric rebuild. Distinct idea: strings as output accumulators.


I-22 — Anagram check (case-blind, letters only)

Difficulty: ★★★ · Topics: strings, counting, normalization

Read two lines. Print ANAGRAMS if they contain exactly the same letters (ignoring case and non-letters, spaces included in neither), else NOT.

Input: two lines, each ≤ 100 chars. Output: one word. Sample tests: Dormitory / Dirty Room! → ANAGRAMS · apple / pale → NOT Hints: ① tally 26 counts for each line (tolower’d letters); ② compare the two tallies. Reference solution

#include <iostream>
#include <string>
#include <cctype>
using namespace std;
int main() {
    string a, b;
    getline(cin, a);
    getline(cin, b);
    int ca[26] = {0}, cb[26] = {0};
    for (size_t i = 0; i < a.size(); i++)
        if (isalpha(a[i])) ca[tolower(a[i]) - 'a']++;
    for (size_t i = 0; i < b.size(); i++)
        if (isalpha(b[i])) cb[tolower(b[i]) - 'a']++;
    bool same = true;
    for (int i = 0; i < 26; i++) if (ca[i] != cb[i]) { same = false; break; }
    cout << (same ? "ANAGRAMS" : "NOT") << "\n";
    return 0;
}

Explanation: the letter-tally comparison — signature-words, not sorting — and the 'a'-offset indexing from I-19. The canonical anagram trap sample (pale vs apple) is what a length pre-check would shortcut: state that as an extension. Distinct idea: multiset equality via tallies.


I-23 — Sentence capitalizer

Difficulty: ★★★ · Topics: strings, state across characters

Read one line of sentences separated by . (period space). Capitalize the first letter of each sentence; the rest lowercase. Print the result.

Input: one line, ≤ 200 chars, at least one sentence. Output: the normalized line. Sample tests: hello THERE. how ARE you. → Hello there. How are you. Hints: ① a boolean newSentence starts true; ② after a ., set it true; letters otherwise lowercase it false after use. Reference solution

#include <iostream>
#include <string>
#include <cctype>
using namespace std;
int main() {
    string s;
    getline(cin, s);
    bool capNext = true;
    for (size_t i = 0; i < s.size(); i++) {
        if (s[i] == '.') { capNext = true; }
        else if (isalpha(s[i])) {
            if (capNext) { s[i] = toupper(s[i]); capNext = false; }
            else          s[i] = tolower(s[i]);
        }
    }
    cout << s << "\n";
    return 0;
}

Explanation: one boolean of carried state turns a per-character problem into a context-sensitive one — the state-machine idea that separates intermediate text processing from B-tier character audits. Distinct idea: carried state across a scan.


I-24 — String formatting: CSV line to columns

Difficulty: ★★★ · Topics: strings, splitting, fixed fields

Read one CSV-style line: name,marks,grade (name may contain spaces; exactly two commas). Print it as three aligned columns: name left in width 15, marks right in width 5, grade right in width 6.

Input: one line, e.g. Ali Raza,87,A Output: Ali Raza 87 A Hints: ① find both commas with find, slice with substr; ② stoi the middle piece. Reference solution

#include <iostream>
#include <string>
#include <iomanip>
using namespace std;
int main() {
    string line;
    getline(cin, line);
    size_t c1 = line.find(',');
    size_t c2 = line.find(',', c1 + 1);
    string name  = line.substr(0, c1);
    string marks = line.substr(c1 + 1, c2 - c1 - 1);
    string grade = line.substr(c2 + 1);
    cout << left  << setw(15) << name
         << right << setw(5)  << stoi(marks)
         << setw(6)           << grade << "\n";
    return 0;
}

Explanation: find + substr slicing is the standard-library counterpart to I-15’s manual scanner — and stoi is the string→number bridge the file-handling labs run constantly. Knowing both by hand makes the tools trustworthy. Distinct idea: positional slicing with find/substr.


Part 3 — Functions and records (I-25…I-36)

I-25 — Function over an array: stats

Difficulty: ★★ · Topics: arrays, functions, parameters

Write double average(int a[], int n) and int maxOf(int a[], int n). Read n then n values; print avg: X max: M (avg two decimals).

Input: n (1–100), then n integers (−10⁶…10⁶). Output: one line. Sample tests: 4 3 9 1 7 → avg: 5.00 max: 9 Hints: ① array parameters decay to a pointer — pass n alongside; ② the function doesn’t know the length otherwise. Reference solution

#include <iostream>
#include <iomanip>
using namespace std;

double average(int a[], int n) {
    long long s = 0;
    for (int i = 0; i < n; i++) s += a[i];
    return (double)s / n;
}

int maxOf(int a[], int n) {
    int m = a[0];
    for (int i = 1; i < n; i++) if (a[i] > m) m = a[i];
    return m;
}

int main() {
    int n, a[100];
    cin >> n;
    for (int i = 0; i < n; i++) cin >> a[i];
    cout << fixed << setprecision(2)
         << "avg: " << average(a, n) << " max: " << maxOf(a, n) << "\n";
    return 0;
}

Explanation: the array+length parameter convention — the “pointer and count” pair — is why every C-family API carries a size. The functions are pure, which is exactly what makes them reusable across the next twelve problems. Distinct idea: arrays cross function boundaries by pointer+length.


I-26 — Pass-by-reference fill: readInto

Difficulty: ★★ · Topics: arrays, references, I/O functions

Write int readInto(int a[], int cap) that reads values until a 0 sentinel or cap is reached, stores them in a, and returns the count. Main calls it once, then prints the count and the values.

Input: integers ending with 0 (at most 50 before the sentinel). Output: count: N then the values on one line. Sample tests: 4 8 15 0 → count: 3 / 4 8 15 Hints: ① the count returns; the array fills by reference (arrays always do); ② stop on 0 before storing it. Reference solution

#include <iostream>
using namespace std;

int readInto(int a[], int cap) {
    int n = 0, x;
    while (n < cap && (cin >> x) && x != 0) a[n++] = x;
    return n;
}

int main() {
    int a[50];
    int n = readInto(a, 50);
    cout << "count: " << n << "\n";
    for (int i = 0; i < n; i++) cout << a[i] << " \n"[i == n - 1];
    return 0;
}

Explanation: one function, two channels of output — the filled array (by nature of array parameters) and the count (by return). This dual-channel shape is the idiom behind every “load the data” function in the later labs. Distinct idea: in-channel and out-channel collaboration.


I-27 — Boolean function over an array: anyAbove

Difficulty: ★ · Topics: arrays, predicates, early return

Write bool anyAbove(int a[], int n, int threshold). Read n, n values, then a threshold; print YES or NO.

Input: n (1–100), n integers, threshold (−10⁶…10⁶). Output: one word. Sample tests: 4 10 20 5 8 15 → YES · 4 10 20 5 8 30 → NO Hints: ① return true the moment one qualifies — no need to finish the loop. Reference solution

#include <iostream>
using namespace std;

bool anyAbove(int a[], int n, int threshold) {
    for (int i = 0; i < n; i++)
        if (a[i] > threshold) return true;
    return false;
}

int main() {
    int n, a[100], t;
    cin >> n;
    for (int i = 0; i < n; i++) cin >> a[i];
    cin >> t;
    cout << (anyAbove(a, n, t) ? "YES" : "NO") << "\n";
    return 0;
}

Explanation: early-exit predicates — the search problem in boolean clothing — where the return inside the loop is the optimization. Contrast with I-03’s counting: full pass vs first hit. Distinct idea: existential questions exit early.


I-28 — Function returning the position: indexOf

Difficulty: ★★ · Topics: arrays, search, sentinel returns

Write int indexOf(int a[], int n, int key) returning the first matching index or −1. Read n, n values (guaranteed distinct), key; print the index or absent.

Input: n (1–100), n distinct integers, key. Output: index (0-based) or absent. Sample tests: 5 8 3 9 1 4 9 → 2 · same with key 7 → absent Hints: ① −1 as the “not found” sentinel is a C-family convention — why −1 and not 0? (Because 0 is a valid index.) Reference solution

#include <iostream>
using namespace std;

int indexOf(int a[], int n, int key) {
    for (int i = 0; i < n; i++)
        if (a[i] == key) return i;
    return -1;
}

int main() {
    int n, a[100], key;
    cin >> n;
    for (int i = 0; i < n; i++) cin >> a[i];
    cin >> key;
    int pos = indexOf(a, n, key);
    if (pos == -1) cout << "absent\n";
    else           cout << pos << "\n";
    return 0;
}

Explanation: the −1 sentinel return — linear search as a reusable function — and the caller decides how “not found” is presented. Separation of finding from reporting is the design lesson. Distinct idea: sentinel returns and caller-side reporting.


I-29 — Returning a struct: minMaxSum

Difficulty: ★★★ · Topics: structures, functions, multi-results

Define struct Stats { int mn, mx; long long sum; };. Write Stats analyze(int a[], int n). Read n then n values; print the three fields from the returned struct.

Input: n (1–100), then n integers (−10⁶…10⁶). Output: min: m max: M sum: s. Sample tests: 4 3 9 1 7 → min: 1 max: 9 sum: 20 Hints: ① build a local Stats, return it by value; ② Ba-36 did this with three references — compare the two shapes. Reference solution

#include <iostream>
using namespace std;

struct Stats { int mn, mx; long long sum; };

Stats analyze(int a[], int n) {
    Stats s;
    s.mn = s.mx = a[0];
    s.sum = 0;
    for (int i = 0; i < n; i++) {
        if (a[i] < s.mn) s.mn = a[i];
        if (a[i] > s.mx) s.mx = a[i];
        s.sum += a[i];
    }
    return s;
}

int main() {
    int n, a[100];
    cin >> n;
    for (int i = 0; i < n; i++) cin >> a[i];
    Stats r = analyze(a, n);
    cout << "min: " << r.mn << " max: " << r.mx << " sum: " << r.sum << "\n";
    return 0;
}

Explanation: one named result type instead of three reference out-params — the struct-return shape. When a function’s outputs travel together conceptually, a struct documents that fact; Ba-36’s references suit in-place filling. Both idioms, one comparison. Distinct idea: results as a record.


I-30 — Struct array: top student

Difficulty: ★★★ · Topics: structures, arrays of structs, extremes

Define struct Student { string name; int marks; };. Read n (1–50) students (name without spaces, marks 0–100). Print the topper’s line Topper: name (marks); if several tie, print each on its own line in input order.

Input: n, then n lines name marks. Output: topper line(s). Sample tests: n=3 Ayesha 88 Bilal 92 Sara 92 → Topper: Bilal (92) / Topper: Sara (92) Hints: ① find the max marks first (pass 1); ② print all matches (pass 2). Reference solution

#include <iostream>
#include <string>
using namespace std;

struct Student { string name; int marks; };

int main() {
    int n;
    cin >> n;
    Student s[50];
    for (int i = 0; i < n; i++) cin >> s[i].name >> s[i].marks;
    int best = s[0].marks;
    for (int i = 1; i < n; i++) if (s[i].marks > best) best = s[i].marks;
    for (int i = 0; i < n; i++)
        if (s[i].marks == best) cout << "Topper: " << s[i].name << " (" << best << ")\n";
    return 0;
}

Explanation: arrays of structs with two coordinated passes — find-then-audit (B-38’s separation) applied to records. Ties preserved in input order costs nothing because pass 2 walks forward. Distinct idea: record collections with two-pass queries.


I-31 — Struct function: older()

Difficulty: ★★ · Topics: structures, functions returning structs

Define struct Person { string name; int age; }; and Person older(Person p, Person q). Read two persons (name, age); print Elder: name (age).

Input: two lines name age (ages 1–120). Output: one line. Sample tests: Ayesha 19 / Bilal 22 → Elder: Bilal (22) Hints: ① structs pass by value comfortably at this size; ② tie → return the first. Reference solution

#include <iostream>
#include <string>
using namespace std;

struct Person { string name; int age; };

Person older(Person p, Person q) {
    return (p.age >= q.age) ? p : q;
}

int main() {
    Person a, b;
    cin >> a.name >> a.age >> b.name >> b.age;
    Person e = older(a, b);
    cout << "Elder: " << e.name << " (" << e.age << ")\n";
    return 0;
}

Explanation: a struct as both input and output — the record-aware signature that scales to the records module’s registry problems. The tie rule (first wins) is stated by the sample. Distinct idea: records as natural function currency.


I-32 — Parallel arrays vs struct array (same task, your call)

Difficulty: ★★★ · Topics: structures, arrays, design comparison

Task: read n (1–30) products (name price qty), print the most expensive in-stock product’s line name @ price (qty) — or NONE if all qty are 0. Implement it with a struct array. In a comment at the bottom, state one concrete bug the parallel-arrays version (three separate arrays) risks that the struct version cannot.

Input: n, then n lines (price 1.0–99999.0, qty 0–1000). Output: one line or NONE. Sample tests: n=3 Pen 20 100 / Pad 990 0 / Ink 95 12 → Ink @ 95.00 (12) — hmm, price with decimals: print two decimals. Adjust: Ink @ 95.00 (12) Hints: ① filter qty > 0 first; ② the comment is the graded part — name a mechanism, not a feeling. Reference solution

#include <iostream>
#include <iomanip>
#include <string>
using namespace std;

struct Product { string name; double price; int qty; };

int main() {
    int n;
    cin >> n;
    Product p[30];
    for (int i = 0; i < n; i++) cin >> p[i].name >> p[i].price >> p[i].qty;
    int best = -1;
    for (int i = 0; i < n; i++)
        if (p[i].qty > 0 && (best == -1 || p[i].price > p[best].price)) best = i;
    if (best == -1) cout << "NONE\n";
    else cout << p[best].name << " @ " << fixed << setprecision(2)
              << p[best].price << " (" << p[best].qty << ")\n";
    // Parallel-arrays risk: sorting or swapping one array (say price) without
    // performing the identical swap in name[] and qty[] silently re-pairs
    // unrelated fields. A struct's fields cannot be separated by any swap.
    return 0;
}

Explanation: the struct-vs-parallel-arrays decision — the course’s records module argued it in prose; here the student implements the struct side and articulates the failure mode of the alternative. The single index (best) walking all three fields together is the payoff visible in the code. Distinct idea: cohesion enforced by the type system.


I-33 — Nested struct: Address in Student

Difficulty: ★★★ · Topics: structures, nesting, member access chains

Define struct Address { string city; string phone; }; and struct Student { string name; Address addr; };. Read n (1–10) students as name city phone (no spaces within fields). Print a directory: each line name — city — phone.

Input: n, then n lines. Output: n directory lines with ` — ` separators. Sample tests: n=2 Ayesha Lahore 0300-1234567 / Bilal Karachi 0321-7654321 → Ayesha — Lahore — 0300-1234567 / Bilal — Karachi — 0321-7654321 Hints: ① s.addr.city — member chains read left to right; ② reading nested members is the same as reading flat ones. Reference solution

#include <iostream>
#include <string>
using namespace std;

struct Address { string city; string phone; };
struct Student { string name; Address addr; };

int main() {
    int n;
    cin >> n;
    Student s[10];
    for (int i = 0; i < n; i++)
        cin >> s[i].name >> s[i].addr.city >> s[i].addr.phone;
    for (int i = 0; i < n; i++)
        cout << s[i].name << " — " << s[i].addr.city
             << " — " << s[i].addr.phone << "\n";
    return 0;
}

Explanation: nesting models belongs-to — the address has no life outside its student. The member chain s[i].addr.city is the data’s path made visible; the same structure returns as composition inside classes (OOP module). Distinct idea: containment chains.


I-34 — enum-driven classifier function

Difficulty: ★★★ · Topics: structures, enums, functions, dispatch

Define enum class Level { Fail, Pass, Good, Excellent }; and Level classify(int marks) (Fail <50, Pass <70, Good <85, else Excellent) plus string asText(Level). Read three marks; print each classification.

Input: three integers 0–100. Output: three words, one per line: FAIL PASS GOOD EXCELLENT. Sample tests: 40 72 91 → FAIL / GOOD / EXCELLENT Hints: ① enum class needs Level:: qualification; ② asText is a switch over the enum. Reference solution

#include <iostream>
#include <string>
using namespace std;

enum class Level { Fail, Pass, Good, Excellent };

Level classify(int m) {
    if (m < 50) return Level::Fail;
    if (m < 70) return Level::Pass;
    if (m < 85) return Level::Good;
    return Level::Excellent;
}

string asText(Level l) {
    switch (l) {
        case Level::Fail:      return "FAIL";
        case Level::Pass:      return "PASS";
        case Level::Good:      return "GOOD";
        default:               return "EXCELLENT";
    }
}

int main() {
    for (int i = 0; i < 3; i++) {
        int m;
        cin >> m;
        cout << asText(classify(m)) << "\n";
    }
    return 0;
}

Explanation: enum as a typed classification (not magic ints), a function producing it, and a function rendering it — the pipeline int → Level → string is the records module’s typed-pipeline idea in miniature. Distinct idea: typed classifications through functions.


I-35 — Applied loop: hailstone printer with cap

Difficulty: ★★ · Topics: loops, safety bounds, applied sequences

Print the Collatz sequence for n (1…10⁶) but stop early if it exceeds 10¹⁵ or takes more than 1000 steps. Print the sequence space-separated, then ... if truncated, else the step count.

Input: one integer n. Output: the sequence line and either ... or steps: S. Sample tests: 6 → 6 3 10 5 16 8 4 2 1 / steps: 8 · 27 → sequence begins 27 82 41 124 ... and if it would pass 1000 steps, ... (27 needs 111 — no truncation; invent a forced truncation by testing the guard logic) Hints: ① two stopping conditions in one while; ② print the start value before the loop begins appending. Reference solution

#include <iostream>
using namespace std;
int main() {
    long long n;
    cin >> n;
    cout << n;
    long long steps = 0;
    bool truncated = false;
    while (n != 1 && steps < 1000 && n <= 1000000000000000LL) {
        if (n % 2 == 0) n /= 2;
        else            n = 3 * n + 1;
        cout << " " << n;
        steps++;
    }
    if (n != 1) { cout << " ..."; truncated = true; }
    cout << "\n";
    if (!truncated) cout << "steps: " << steps << "\n";
    return 0;
}

Explanation: the same walk as Ba-06 wearing safety gear — step and magnitude caps — because unbounded exploration is a real-world hazard (the conjecture is unproven!). Guarded iteration is the honest engineering wrapper for mathematical loops. Distinct idea: bounded exploration.


I-36 — Applied loop: range ledger with running balance

Difficulty: ★★ · Topics: loops, accumulators, formatted ledgers

Read n transactions (integer amounts, may be negative) then print a ledger: each line i: amount balance (i from 1), starting balance 0. End with final: B.

Input: n (1–100), then n integers (−10000…10000). Output: n ledger lines + final line. Sample tests: 4 100 -30 50 -200 → 1: 100 100 / 2: -30 70 / 3: 50 120 / 4: -200 -80 / final: -80 Hints: ① print running balance after adding; ② negative balances are legal here — no validation requested. Reference solution

#include <iostream>
using namespace std;
int main() {
    int n;
    cin >> n;
    long long bal = 0;
    for (int i = 1; i <= n; i++) {
        int amt;
        cin >> amt;
        bal += amt;
        cout << i << ": " << amt << " " << bal << "\n";
    }
    cout << "final: " << bal << "\n";
    return 0;
}

Explanation: the ledger loop — state (balance) updated and reported in the same iteration — is the accounting shape behind the expense tracker and bank simulation projects. The i-from-1 indexing matches human ledger numbering, a deliberate choice to discuss. Distinct idea: state visible per step.


I-37 — Applied loop: digit histogram line

Difficulty: ★★ · Topics: loops, counting, bounded ranges

Read n (1–100) integers, each 0–9. Print a histogram line for each digit 0–9 that appears: digit: d ###... where # repeats count times.

Input: n, then n integers (0–9). Output: up to 9 lines. Sample tests: 8 1 3 3 9 3 9 1 7 → digit: 1 ## / digit: 3 ### / digit: 7 # / digit: 9 ## Hints: ① count into cnt[10] (I-09’s tool); ② string(cnt[d], '#') renders each bar. Reference solution

#include <iostream>
#include <string>
using namespace std;
int main() {
    int n, cnt[10] = {0};
    cin >> n;
    for (int i = 0; i < n; i++) { int x; cin >> x; cnt[x]++; }
    for (int d = 0; d <= 9; d++)
        if (cnt[d] > 0) cout << "digit: " << d << " " << string(cnt[d], '#') << "\n";
    return 0;
}

Explanation: tally then render — the two-phase count-and-present split that every report generator follows. The bar is data turned into visual output; the same phase split drives the analytics labs. Distinct idea: count phase, render phase.


I-38 — Applied loop: interleaved merge of digits

Difficulty: ★★★ · Topics: loops, digits, index arithmetic

Read two positive integers a and b. Interleave their digits — a’s first digit, b’s first digit, a’s second, b’s second — printing the resulting number. If one runs out, append the rest of the other.

Input: two integers 1…10⁹. Output: one integer. Sample tests: 123 4567 → 1425367 · 90 12 → 9102 Hints: ① peel both from the right and the result builds reversed — easier to un-reverse at the end (Ba-03’s tool); ② or extract digit counts first and walk from the left. Reference solution

#include <iostream>
using namespace std;
int main() {
    long long a, b;
    cin >> a >> b;
    // Peel from the right into reversed results, then reverse each.
    long long ra = 0, rb = 0;
    int la = 0, lb = 0;
    while (a > 0) { ra = ra*10 + a % 10; a /= 10; la++; }
    while (b > 0) { rb = rb*10 + b % 10; b /= 10; lb++; }
    long long result = 0;
    int ia = la, ib = lb;              // digits remaining in each (reversed) number
    while (ia > 0 || ib > 0) {
        if (ia > 0) { result = result*10 + ra % 10; ra /= 10; ia--; }
        if (ib > 0) { result = result*10 + rb % 10; rb /= 10; ib--; }
    }
    cout << result << "\n";
    return 0;
}

Explanation: left-to-right interleaving via right-peel + un-reverse is the classic digit-gymnastics composition — Ba-03’s builder, Ba-09’s two-stream walk, and Ba-03’s reverse combined. The if per stream handles unequal lengths without special cases. Distinct idea: stream interleave with exhaust-when-empty.


I-39 — Applied loop: fare meter

Difficulty: ★★ · Topics: loops, tiered arithmetic, state

A taxi charges Rs 70 for the first 2 km (or part), then Rs 32 per additional km or part. Read a list of trip distances (km, decimals allowed) ending with 0. Print each trip’s fare, then total: T.

Input: distances (0.1–100.0), one per line, ending with 0. Output: fare per trip (integer) then total. Sample tests: 1.5 3 0 → 70 / 134 / total: 204 (3 km → 70 + 1 extra “whole or part” km × 32 = 102) Hints: ① fare = 70 + max(0, ceil(d − 2)) × 32; ② ceil from <cmath>; ③ the sentinel ends the loop but is not a trip. Reference solution

#include <iostream>
#include <iomanip>
#include <cmath>
using namespace std;
int main() {
    double d;
    long long total = 0;
    cout << fixed << setprecision(0);
    while (cin >> d && d != 0) {
        long long fare = 70;
        if (d > 2.0) fare += (long long)ceil(d - 2.0) * 32;
        cout << fare << "\n";
        total += fare;
    }
    cout << "total: " << total << "\n";
    return 0;
}

Explanation: tiered fare with “or part” semantics — ceil on the excess (B-29’s tool) inside a sentinel loop (B-19’s shape), plus a running total (the ledger pattern). Three proven pieces composed into one business rule. Distinct idea: business rules from composed pieces.


I-40 — Applied loop: staircase summary with milestones

Difficulty: ★★★ · Topics: loops, thresholds, event reporting

Read n savings deposits (integers) and a goal g. Print a running total after each deposit; each time the cumulative total reaches or passes g for the first time, also print GOAL at deposit k. At the end print saved: T and goal: reached or goal: unmet.

Input: g (1–10⁶), n (1–100), then n integers (1–10000). Output: as specified. Sample tests: g=500, n=4, deposits 200 250 100 50 → after 1: 200 / after 2: 450 / after 3: 550 / GOAL at deposit 3 / after 4: 600 / saved: 600 / goal: reached Hints: ① a boolean goalSeen makes the milestone fire exactly once; ② print order: running line, then milestone if it just crossed. Reference solution

#include <iostream>
using namespace std;
int main() {
    long long g, bal = 0;
    int n;
    bool goalSeen = false;
    cin >> g >> n;
    for (int i = 1; i <= n; i++) {
        int d;
        cin >> d;
        bal += d;
        cout << "after " << i << ": " << bal << "\n";
        if (!goalSeen && bal >= g) {
            cout << "GOAL at deposit " << i << "\n";
            goalSeen = true;
        }
    }
    cout << "saved: " << bal << "\n"
         << "goal: " << (goalSeen ? "reached" : "unmet") << "\n";
    return 0;
}

Explanation: a one-shot milestone inside a running-total loop — the goalSeen latch converts a “crossing” event into exactly one report. Event-latching inside accumulation loops is the savings/goal pattern the expense tracker uses; note the order of print versus latch matters and the sample pins it. Distinct idea: latched events in accumulation.


Tier check: 40 problems · I-01–I-40 · update the checklist, then take on advanced.md.