Pointers Memory-Tracing Exercises (10)

← Module home · The rule of this page: diagram first, verdict second, code never. You are not asked to write programs — you are asked to see them. Every answer includes the reference diagram drawn in the course style; check your arrow work against it.

Drawing style (same as the lessons): one box per variable, address above the box, value inside, arrows for pointers, dashed outline for heap boxes, and heap boxes drawn lower, separated from the stack.

   STACK                        HEAP
  ┌──────┐                    ╔══════╗
  │ 1000 │ p                 ║  42  ║  anonymous
  └──────┘                    ╚══════╝
      ↑___________________________|

Trace each snippet statement by statement — one diagram per state change — then commit to the answers. All solutions are in the answers section (separated so you can’t peek by accident).


T1 — Warm-up: names, values, addresses (★)

int x = 7;
int y = x;
y = 9;

Draw the state after each line (choose addresses: x at 1000, y at 1004). Answer: (a) after line 2, what is x? (b) which statement proved y was a copy, not an alias?

T2 — The alias (★)

int x = 7;
int& r = x;
r = 9;

Draw all three lines (draw r as a label, not a box — Lesson 2 §2). Answer: (a) after line 3, x = ? (b) how many boxes exist? (c) what does &r print?

T3 — The pointer twin (★)

int x = 7;
int* p = &x;
*p = 9;

Draw after each line. Answer: (a) how many boxes exist now (count p!) (b) after line 3, x = ? (c) name the one statement that would make p point at a new, different variable y.

T4 — Two jobs (★)

int a = 1, b = 2;
int* p = &a;
p = &b;
*p = 20;

Draw four diagrams — one per line. Answer: (a) which two lines changed the arrow, and which changed a box? (b) final a and b?

T5 — The dropped arrow (★★ — the leak, by eye)

int* p = new int(10);
p = new int(20);

Draw after line 1. Then draw after line 2 — and mark the orphan. Answer: (a) what happened to the first box? (b) name the family and the one-line fix (two acceptable fixes).

T6 — Swap, three ways (★★)

Version A: void swapV(int a, int b) — plain values, classic swap body. Version B: void swapR(int& a, int& b) — references. Version C: void swapP(int* a, int* b) — pointers, body uses *a/*b. Call each with swap?(x, y) / swapP(&x, &y) from main, x=1, y=2. Draw the moment of the first body line for each version (what boxes exist inside the callee?). Answer: (a) which version(s) affect main’s boxes, and by what mechanism? (b) for version A, what would x and y be after the call?

T7 — Reference vs pointer parameter (★★)

void refOn(int& r)  { r = r + 1; }
void ptrOn(int* p)  { *p = *p + 1; }

int main() {
    int n = 10;
    refOn(n);
    ptrOn(&n);
}

Draw both calls at their moment of execution (parameter boxes included; for ptrOn, draw p’s own stack box). Answer: (a) after both calls, n = ? (b) which callee has a box holding an address? (c) which callee cannot be called on a null target, ever, and why?

T8 — Array name and arithmetic (★★)

int arr[4] = {10, 20, 30, 40};
int* p = arr + 1;
std::cout << *p;      // ?
p = p + 2;
std::cout << *p;      // ?

Draw the array at 5000 (boxes 5000/5004/5008/5012), then p after each statement. Answer: (a) the two printed values (b) what does p - 1 point at after the last line? (c) what would *(p + 1) read after line 4 — and is that read safe?

T9 — The dynamic block (★★★)

int n = 3;
int* data = new int[n];
data[0] = 5;
data[1] = 6;
data[2] = 7;
int* cursor = data;
delete[] data;
data = nullptr;
// ...and the snippet stops. cursor is never touched again.

Draw at the peak (after line 6), and again after line 8. Answer: (a) at the peak, which stack boxes hold addresses? (b) after line 8, what does cursor hold — is it null? (c) name the exact latent bug this snippet ends with, its family, and the two-line repair.

T10 — The mystery snippet (★★★ — diagnose by eye)

A classmate wrote this and reports it “usually works”:

int* make() {
    int local = 99;
    return &local;
}

int main() {
    int* p = make();
    std::cout << *p << '\n';     // prints 99?! "works!"
}

Draw the stack at the moment make returns, and the moment after. Answer: (a) what does the returning do to local’s box, in diagram terms? (b) why does the print often show 99 anyway? (c) which family is this, which lesson section names it, and what are the two honest fixes? (d) why is “it printed 99” worthless as evidence?


Answers

A1 — T1 (copy semantics)

After line 2: x = 7 (at 1000), y = 7 (at 1004) — two boxes, same value. Line 3 changes only y to 9; x stays 7. (a) x = 7. (b) line 3 — an alias would have changed x too; a copy doesn’t.

A2 — T2 (the alias)

(a) x = 9. (b) one box (1000) — r is a label on it, not a box. (c) &r prints 1000 — x’s address; a reference exposes its target’s address. (Lesson 2 §2)

A3 — T3 (the pointer twin)

(a) two boxes: x at 1000, p at 2004 holding the value 1000. (b) x = 9 — the write went through the arrow. (c) p = &y; — Job 1, re-point. (T2’s reference cannot do this; that’s the pair’s whole point.)

A4 — T4 (two jobs)

(a) lines 3 and 1… precisely: line 2 (p = &a) and line 3 (p = &b) move the arrow; line 4 (*p = 20) changes a box (b). (b) a = 1, b = 20.

A5 — T5 (the dropped arrow)

After line 2: p holds the second box’s address; the first heap box has no incoming arrow — mark it orphaned. (a) it leaked: allocated, unowned, unreturnable. (b) Family 1 (leak). Fixes: int* q = p; p = new int(20); (hand the arrow to a second owner-pointer) — or delete p; before re-pointing. (Lesson 3 §5)

A6 — T6 (swap three ways)

At the first body line: A — the callee has its own two stack boxes (copies of 1 and 2); swapping them touches nobody else. B — the callee has no new boxes; a/b are labels on main’s boxes. C — the callee has two small stack boxes, each holding an address of main’s boxes; the body follows them. (a) B (aliases) and C (copied addresses that still land on the originals) affect main; A affects only its own copies. (b) x = 1, y = 2 — the classic why-swap-needs-references demonstration.

A7 — T7 (reference vs pointer parameter)

(a) n = 12 (each call adds 1). (b) only ptrOn — its p is a real stack box holding n’s address. (c) refOn — a reference cannot be null, and there is no syntax to even attempt it (refOn(nullptr) doesn’t compile); the safety is structural, not a runtime check.

A8 — T8 (arithmetic)

(a) prints 20 (p at 5004) then 40 (p at 5012 — 5004 + 2 strides of 4). (b) p - 1 points at 5008 — value 30. (c) *(p + 1) would read 5016 — one past the last box: unsafe to dereference; the [begin,end) stop mark (Lesson 3 §1). Diagnosing this by eye is exactly what the diagram is for.

A9 — T9 (the dynamic block)

(a) at the peak, data and cursor both hold the heap block’s address — two arrows, one block. (b) cursor still holds the old address — it is not null; only data was nulled. (c) cursor is a dangling pointer: the block was returned while cursor still aims at it (Family 2). Repair: cursor = nullptr; on the delete line (or scope cursor so it dies with the block, or set both in one habit: delete[] data; data = nullptr; cursor = nullptr;). The lesson: every arrow to a freed box needs taming, not just the deleting one.

A10 — T10 (the mystery snippet)

(a) returning pops make’s frame — local’s box ceases to exist; p’s arrow now points at a recycled region of stack. (b) the bytes 99 often survive untouched for a while — the print imitates correctness. (c) Family 2, dangling — the compiler even warns (address of local variable returned); fixes: return by value, or a heap box with documented ownership (Lesson 3 §2, D6). (d) undefined behaviour may imitate correctness today and corrupt tomorrow — the diagram shows the truth the output hides: an arrow to a box that no longer exists.