Pointers Exercises (20 guided)

← Module home · ★ = first pass · ★★ = needs the toolkit · ★★★ = combines ideas

How to use this page. Every exercise’s first deliverable is the diagram — boxes, addresses, arrows — then the code. Attempt 15 minutes before opening any solution. ★ items need only Lessons 1–2; ★★★ items combine all three lessons.


Part A — Addresses, pointers, dereference (★, E1–E6)

E1. Write the three-line program: declare int x = 42;, print x and &x. Then explain in one sentence why the address changes between runs of the program (hint: Lesson 1 §2).

E2. Declare a pointer to x from E1, print p, *p, and &x — three outputs, one sentence each: what is each output? Then change x and print *p again.

E3. Syntax triage — state whether each compiles, and what it means: (a) int* p = &x; (b) int p = &x; (c) *p = 7; (given E2’s p) (d) int* p; *p = 7; (e) p = nullptr;.

E4. Start from int a = 5, b = 10; int* p = &a;. Write the single statement that makes b become 99 without naming b. Then write the statement that makes p point at b. Draw before/after diagrams for both.

E5. nullptr drills: write a pointer that points at nothing; write the guard that prints through it safely; state what happens if the guard is missing (both the symptom and why the symptom is “the good failure mode”).

E6. Evaluate each expression given int x = 8; int* p = &x;: (a) *p (b) &*p (c) *&x (d) p (e) *x. Two of them are wrong — which, and why?


Part B — The two jobs, references, functions (★–★★, E7–E13)

E7. Classify each line as Job 1 (re-point) or Job 2 (write through), then give the final values:

int a = 1, b = 2;
int* p = &a;
p = &b;      // ?
*p = 20;     // ?
p = &a;      // ?
*p = *p + b; // ?

E8. Write void zeroOut(int& n) and void zeroOutPtr(int* n) — the same job in both styles. Call each from main correctly. Then list the ceremony differences (the & at the call, the * in the body, the guard).

E9. Write void divide(int& quotient, int& remainder, int a, int b) that reports both results of dividing a by b. Guard the b==0 case (set both outputs to 0 and return — document it). Test with 17/5.

E10. The in/out pattern: write void normalize(double* value, double minV, double maxV) that clamps *value into [minV, maxV] — reads it, possibly writes it back. Call it on a temperature. Which lesson-2 section is this pattern from?

E11. Decision drill — for each requirement, choose reference or pointer and justify with the §3 rule: (a) swap two doubles (b) a function returning “the address of the first negative element, or nothing” (c) an out-parameter that always exists (d) a cursor that walks an array inside a loop.

E12. Write const int* findMin(const int* a, int n) returning the address of the smallest element (or nullptr when n ≤ 0). Use it in main with the null guard, printing *result.

E13. The const ladder: for each signature, state in plain words what may and may not change: (a) void f(int* p) (b) void f(const int* p) (c) void f(int* const p) (d) void f(int& r) (e) void f(const int& r).


Part C — Arrays and dynamic memory (★★–★★★, E14–E20)

E14. Given int arr[4] = {7, 3, 9, 1};, evaluate: (a) arr (in an expression) (b) *arr (c) arr[2] (d) *(arr + 2) (e) arr + 2 (f) &arr[3]. Draw the array with addresses (start it at 5000) and mark each answer on the drawing.

E15. Write the pointer-walking loop that prints an array backward using only pointer arithmetic (no [i], no index variables). Trace it on E14’s array.

E16. Dynamic basics: read n from input, allocate n doubles, fill them with i * 1.5, print them, release them — pairs counted, same-line idiom used. Why would double arr[n]; not compile here?

E17. Write int* resized(const int* old, int oldN, int newN) that allocates a new array of newN, copies min(oldN, newN) values over, and returns the new handle (the caller still owns the old one — document that contract). Trace the ownership in a diagram.

E18. Family identification — for each snippet, name the family (leak / dangling / invalid access) and the fix: (a) int* p = new int(5); p = new int(6); (b) int* p = new int(5); delete p; std::cout << *p; (c) int* p = new int[3]; std::cout << p[5]; (d) int* make() { int v = 9; return &v; }

E19. Ownership audit: the §4 readValues template is used like this —

int* a = readValues(n1);
int* b = a;
delete[] a;
delete[] b;      // ?

State exactly what goes wrong at the last line, which ownership rule it breaks, and repair the snippet.

E20. Capstone drill: write a program that reads n, allocates an array, reads the values, prints the average, and nothing else — with: the null/degenerate guard, the owner comment, one delete[] + same-line nullptr, and a diagram of the stack and heap at the moment of main’s peak. (This is the mini-project’s seed.)


Solutions (S1–S20)

S1 — Three outputs

int x = 42;
std::cout << x << ' ' << &x << '\n';

The address differs between runs because the operating system places the program wherever it likes each time — the specific number is unreliable by design; the relationship (&x is where x lives) is what matters. (Lesson 1 §2)

S2 — Pointer to x

p prints an address (the same one &x printed — the stored arrow), *p prints 42 (the value at that address), &x prints x’s address. After x = 50;, *p prints 50 — the pointer wasn’t “told”; it aims at the box, and the box changed. (Lesson 1 §3–4)

S3 — Syntax triage

(a) compiles — p is a pointer to int, aimed at x. (b) compile error — p would be a plain int; it can’t store an address. (c) compiles — writes 7 into x through p. (d) compiles (with a warning) — undefined behaviour: dereferencing an uninitialized pointer (Module rule 1). (e) compiles — re-points p at nothing; now null, checkable.

S4 — b becomes 99

*p = 99; after p = &b;… precisely: first p = &b; (Job 1, move the arrow), then *p = 99; (Job 2, write the target). Two statements — but the first write-through that lands on b is the answer to “without naming b”: *p = 99 where p aims at b. Diagrams: before, p→a; after Job 1, p→b; after Job 2, b holds 99.

S5 — nullptr drills

int* q = nullptr;
if (q != nullptr) std::cout << *q;
else              std::cout << "nothing to print\n";

Without the guard: dereferencing null is undefined behaviour — typically an immediate segmentation fault. That’s the “good failure mode”: loud, at the guilty line, instead of garbage-pointers’ silent misbehaviour. (Lesson 1 §5)

S6 — Expression check

(a) 8 (b) &*p = p (follow, then ask where — back at p) (c) 8 (ask where x lives, then go there — back at x) (d) p’s value: x’s address (e) compile error / garbage — *x dereferences a non-pointer int; meaningless. So (e) is wrong; and (b)/(c) are the cancellations.

S7 — Two jobs, classified

Line 3 Job 1 (p→b) · line 4 Job 2 (b = 20) · line 5 Job 1 (p→a) · line 6 Job 2 (a = 1 + 20 = 21 — reads b through p… verify: after line 5, p→a, so *p is a; a = a + b = 1 + 20 = 21). Final: a = 21, b = 20. (Lesson 2 §1)

S8 — zeroOut both ways

void zeroOut(int& n)    { n = 0; }      // alias: plain assignment
void zeroOutPtr(int* n) { if (n) *n = 0; }   // arrow: guard, then write through
// calls:  zeroOut(x);    zeroOutPtr(&x);

Ceremony differences: pointer needs & at the call, * in the body, and the null check; the reference needs none — it can’t be null. (Lesson 2 §2, §4)

S9 — divide

void divide(int& quotient, int& remainder, int a, int b) {
    if (b == 0) { quotient = 0; remainder = 0; return; }   // documented policy
    quotient  = a / b;
    remainder = a % b;
}

17/5 → quotient 3, remainder 2. Two live outputs → references by the §3 rule.

S10 — normalize

void normalize(double* value, double minV, double maxV) {
    if (value == nullptr) return;                 // pointer → guard
    if (*value < minV)      *value = minV;
    else if (*value > maxV) *value = maxV;
}
// caller: normalize(&temp, 16.0, 30.0);

This is the in/out parameter pattern (Lesson 2 §4): read, then conditionally write back through the same arrow.

S11 — Decision drill

(a) reference — targets always exist, no re-aiming. (b) pointer — “or nothing” is the null state. (c) reference — always exists. (d) pointer — traversal needs re-aiming/arithmetic. (Lesson 2 §3)

S12 — findMin

const int* findMin(const int* a, int n) {
    if (a == nullptr || n <= 0) return nullptr;
    const int* best = a;                       // champion by ADDRESS
    for (int i = 1; i < n; i = i + 1)
        if (a[i] < *best) best = &a[i];        // & — the address of the smaller one
    return best;
}
// main: const int* r = findMin(data, n);  if (r) std::cout << *r << '\n';

The Unit 09 champion, re-expressed: the index-tracking champion becomes address-tracking — &a[i] instead of bestI = i.

S13 — Const ladder

(a) may change the target and re-point. (b) may look only — *p read-only (re-pointing still allowed). (c) arrow soldered — may write *p, never re-point. (d) may change the target; no null, no re-attach by nature. (e) look only, target exists, no ceremony. (Lesson 2 §4)

S14 — Array expressions

Diagram with arr at 5000: boxes 5000:7, 5004:3, 5008:9, 5012:1. (a) arr → 5000 (address of first element) (b) *arr → 7 (c) arr[2] → 9 (d) *(arr + 2) → 9 — same as (c) (e) arr + 2 → 5008 (address of the third box; arithmetic scales by 4) (f) &arr[3] → 5012. (Lesson 3 §1)

S15 — Backward walk

const int* p = arr + 4;        // last box
const int* end = arr - 1;      // one BEFORE the first — the stop mark
while (p != end) {
    std::cout << *p << ' ';
    p = p - 1;
}

Trace: p at 5012 → prints 1 → 5008 prints 9 → 5004 prints 3 → 5000 prints 7 → p == arr−1 → stop. Output: 1 9 3 7. (Note: arr - 1 as a stop mark is fine; never dereference it.)

S16 — Dynamic basics

int n;  std::cin >> n;
double* a = new double[n];
for (int i = 0; i < n; i = i + 1) a[i] = i * 1.5;
for (int i = 0; i < n; i = i + 1) std::cout << a[i] << ' ';
std::cout << '\n';
delete[] a;
a = nullptr;

double arr[n]; doesn’t compile because stack array sizes must be known at compile time — runtime size is exactly what the heap is for. Pairs: one new[], one delete[] ✓.

S17 — resized

// Contract: caller owns BOTH arrays on return — releases the old one itself.
int* resized(const int* old, int oldN, int newN) {
    int* fresh = new int[newN];
    int keep = (oldN < newN) ? oldN : newN;
    for (int i = 0; i < keep; i = i + 1) fresh[i] = old[i];
    return fresh;
}

Ownership diagram: two heap blocks; fresh’s arrow travels up to the caller; the old block stays owned by whoever owned it before — the function deliberately does not delete it (non-owner; const says look-only).

S18 — Family identification

(a) leak — box 1 orphaned by the re-point; fix: delete before re-pointing (or hand off). (b) dangling — use after delete; fix: p = nullptr; on the delete line, then guard. (c) invalid access — out of bounds read; fix: respect capacity (the bounds rule). (d) dangling — address of a dead local; fix: return by value, or take/return a heap box with documented ownership. (Lesson 3 §5)

S19 — Ownership audit

delete[] b is a second delete of the same box — both pointers own it, which is exactly the “two owners” corruption the ownership rule forbids (heap corruption; often a crash later, far away). Repair: one owner —

int* a = readValues(n1);
delete[] a;
a = nullptr;      // a is now null, not dangling — and no second delete exists

(or copy values, not ownership, if both arrays are genuinely needed).

S20 — Capstone drill

#include <iostream>

int main() {
    int n = 0;
    std::cin >> n;
    if (n <= 0) { std::cout << "no data\n"; return 0; }   // degenerate guard

    int* data = new int[n];               // OWN
    for (int i = 0; i < n; i = i + 1) std::cin >> data[i];

    int total = 0;
    for (int i = 0; i < n; i = i + 1) total += data[i];
    std::cout << (1.0 * total / n) << '\n';   // cast rule

    delete[] data;                        // RELEASE — exactly once
    data = nullptr;
    return 0;
}

Peak diagram: stack — n, data (arrow), i, total; heap — the n-box block, arrowed from data. Every requirement ticked: guard ✓, owner comment ✓, one delete[] ✓, same-line nullptr ✓.