Class-Design Exercises — 10 drills

← Module home · These problems start before the code. For each: run the six-step method (nouns → verbs → invariants → interface → birth → tests) on paper, then compare with the separated design review. “It compiles” is not the success criterion here — a defensible interface is.

The deliverable per drill, before peeking:

  1. Attributes (name, type, initial value) — and why each earns its place
  2. Invariants, written as sentences
  3. Interface table: method / parameters / returns / mutates? / guards
  4. Constructor parameters (the “birth”)
  5. Relationships, if more than one class
  6. Test table: normal, boundary, invalid


Design reviews — after your own sketch

R1 — VendingMachine. Attributes: prices[5], stock[5], credit, collected. Verbs distribute across roles: customer verbs (insertCoin, select(slot) -> bool, refund()) vs owner verbs (restock(slot, qty), collect() -> long long) — one class is defensible; two (Machine + CoinBox) is better if you noticed the credit rules are a self-contained invariant (“credit ≥ 0 always”). Key guards: selection requires stock[slot] > 0 && credit >= price[slot]; on success both decrement properly and change credit = credit − price. Test families: exact change, over-insertion then selection, insufficient credit, empty slot, refund with/without credit. The review question this drill is built around: who may call the owner verbs? (In a real system, roles; in this course, document the assumption in a comment — the interface table is where that honesty lives.)

R2 — DigitalClock. Attributes: h, m, s (or one secondsSinceMidnight — even better: single attribute, rollover is one modulo, and toString derives h/m/s; praise whichever you chose if you wrote the trade-off). tick() mutates; guards are rollover arithmetic, not refusal — this class’s boundaries are the wrap points. Setters: none. A clock that accepts setHours(25) is broken by design; time enters only through tick(). If you added setters “for completeness,” the review pushes back: E9’s Password lesson again — every door is a way in, and doors with no purpose are attack surface.

R3 — Elevator. State: floor (1–10), direction (idle/up/down), and a request set — a bool requests[11] (index 0 unused) is the honest beginner structure (the Arrays module’s index-by-data tally, reused). call(f) guards f ∈ [1,10] and sets the flag; step() is the design’s heart: if a request exists at the current floor, clear it and (decide!) keep direction; else move toward the nearest flagged floor in the current direction, flipping direction at the ends — or idle when no flags. Write the invariants as sentences first: “floor never leaves [1,10]”; “direction is idle iff no requests and nothing pending”. Test families: single call up/down, two calls opposite directions, call to current floor, call during movement. Boundary: floors 1 and 10 direction flips. If your step() grew past ~15 lines, the review suggests extracting nearestRequest() const — methods are functions; the one-job rule still holds.

R4 — Playlist. vector<string> songs; int current = 0; The invariant “current names a real song” breaks at: remove(current) — the two defensible policies are (a) remove shifts current to the next song, (b) remove when only one song exists resets to empty-and-currentless (a count == 0 state, requiring current() const to define a no-song answer — "" and a bool hasCurrent() const). Whichever you chose, the tests must visit both edges: remove the current song; remove the last remaining song; next() on a one-song playlist (wraps to itself); moveUp on the first song (refuse or wrap — document). This drill exists because states you didn’t design are states users will visit.

R5 — Thermostat. Attributes: target, tolerance = 0.5, heating (bool). update(double t): if t < target - tolerance → heating = true; if t > target + tolerance → heating = false; inside the band: no change — the “no double flip” invariant is enforced by doing nothing in the middle, which is why the band exists at all (a thermostat without hysteresis clicks on/off around the setpoint forever; the tolerance is the design). The review’s extra credit: isHeating() const, and the observation that update is the only writer of heating — one door, one rule.

R6 — ParkingGarage. Capacity from the Arrays module: a vector<string> grows honestly and full() is plates.size() == capacity; a fixed array needs the count and the clamp discipline (P13’s lesson). Either is defensible; the review wants the reason written. admit guards: not full, not already present (isPresent — a linear search, Algorithms module), plate non-empty. release guards: present. occupancy() const is derived — computed, never stored (the Records rule; storing a count parallel to the vector invites the drift the parallel-arrays section warned about). Tests: admit to capacity exactly, one over; release absent plate; double admit of the same plate; admit-release-admit same plate.

R7 — Exam + Question. Question owns its own data invariantly: options must be 4, answer index in [0,3], marks > 0 — enforced in its constructor/setters; it offers checkAnswer(int) const -> bool and getMarks() const. Exam owns the collection (vector<Question>), the addQuestion door (maybe a limit), totalMarks() const (derived: sum — computed, never stored), and grade: because grading is iteration over questions, it belongs to the class that can see all of them — Question can’t grade an exam, and putting grade on Exam keeps the answer-checking on Question while the orchestration sits with the owner. The relationship is composition (the exam owns its questions). The review’s favourite question: should grade take const int answers[] with n, or const vector<int>&? Either — but say why (arrays-as-parameters bring the size-travels-separately rule; vectors carry their own size — Unit 09’s choosing table, applied).

R8 — BankAccount + TransactionLog. Inner struct Txn { string type; long long amount; long long resultingBalance; }; owned as Txn history[10]; int txnCount = 0; — a ring buffer (drop the oldest when full) or a clamp-then-stop; state the policy. Composition: the log is born (constructor) and dies (destructor) with the account — no separate lifetime, no ownership anxiety. deposit/withdraw append a record after a successful state change (the log records facts, not intentions — a refused withdrawal isn’t a transaction; if you logged refusals too, that’s defensible for an audit log: say so). getStatement() const prints or returns the entries — const, because reading the past changes nothing. The review question: why does the account validate and then log, rather than the log validating? (The invariant is the account’s; the log is a record-keeper, not a policy-maker.)

R9 — HotelRoom + Booking. Attributes: tier (enum class Tier { Standard, Deluxe }), ratePerNight, occupied (bool), guest, nights (or dates — the drill allows a simple counter if you state the simplification). One-way doors: checkIn refuses when occupied (no double booking); checkOut refuses when !occupied, computes charge = nights * ratePerNight by tier, resets state, returns the charge (a bool return can’t carry it — the return-type row of your interface table should show long long). Booking as a separate class earns its keep only if bookings outlive or precede occupancy (aggregation — future reservations); if booking == occupancy, a second class is ceremony, and the review says so. Tests: check-in → check-out → check-in again; double check-in refused; check-out of empty room refused; charge arithmetic per tier.

R10 — the schema audit. The six-plus failures, itemized: (1) two parallel arrays of students — the Records module’s founding horror: name[i] and gpa[i] held together only by index discipline (swap one without the other and the data corrupts silently); (2) fixed magic capacities (5000/200) with no clamp anywhere — setGpa(6000, 3.9) writes out of bounds; (3) a public-ish registrarPassword in the same class — unrelated responsibility stuffed into one type (the god-class smell; also a Password class exists for exactly this, E9); (4) setGpa validates nothing — a 9.4 GPA walks in (the guard was the one job the method had); (5) index-keyed access — no way to find a student except knowing the slot; no find, no invariants across the collection (duplicate entries trivially possible); (6) no constructors — the arrays are born unvalidated, and any subset of slots is “data”. The corrected design: class Student (name, gpa with 0.0–4.0 guard, constructor) + class Course (code, title, roster) + class University has-a vector<Student> and vector<Course> with finding/admission methods — three nouns, three classes, relationships stated, each class defending its own invariants. If your redesign kept one big class, redo it — the audit’s whole point is that responsibilities want separate walls.


Where next

— Engr. Dr. Muhammad Nadeem Majeed, Professor, Department of Data Science (PUCIT), University of the Punjab, Lahore · About the instructor