Debugging — 10 seeded hunts

← Module home · Each snippet compiles (or nearly) but misbehaves. Predict the symptom, form a hypothesis, then read the separated diagnosis. Compile with -Wall -Wextra — several of these bugs announce themselves there.


D1 — The account with a side door

class BankAccount {
public:
    void deposit(long long a) { if (a > 0) balance += a; }
    long long getBalance() const { return balance; }
    long long balance = 0;        // ← the reviewer's eyebrow
private:
};

int main() {
    BankAccount acc;
    acc.deposit(500);
    acc.balance = 0;              // "reconciliation"
    cout << acc.getBalance() << "\n";
    return 0;
}

Why does the guard in deposit fail to protect anything, and what one-line move fixes the class?

Diagnosis

balance sits above the private: label — members are public by default in a class until a label says otherwise, so the attribute is reachable from main. The assignment wipes the guarded balance; the invariant “balance changes only through deposit/withdraw” was never structural. Fix: move the attribute under private:. The meta-lesson: in a class, the first members are public unless you say otherwise — placement of the label is the design. (In a struct the default is public; that’s the whole struct-vs-class difference.)


D2 — The constructor that never runs

class Point {
public:
    void Point(int x, int y) {      // ← suspect
        this->x = x; this->y = y;
    }
    int getX() const { return x; }
private:
    int x = 0, y = 0;
};

int main() {
    Point p(3, 4);
    cout << p.getX() << "\n";
    return 0;
}

The programmer expected p to be (3, 4). The program doesn’t even compile — why, and what exactly did void break?

Diagnosis

Constructors have no return type — writing void makes Point(int, int) an ordinary method named after the class, and Point p(3, 4); then finds no matching constructor. The compiler error is a friend here: it names the missing constructor. Remove void. (If the class had been used via p.Point(3,4); it would compile — and the object would spend its first moments uninitialized-by-design — the worst version of the bug.) Rule: a function named exactly like its class, with any return type, is not a constructor.


D3 — The getter that writes

class Counter {
public:
    int getCount() {                // ← missing const, but there's more
        accesses++;                 // "instrumentation"
        return count;
    }
    void increment() { count++; }
private:
    int count = 0, accesses = 0;
};

int main() {
    const Counter c;
    c.increment();                  // ← fails first
    return 0;
}

Two separate defects here — one is the missing const, one is a design decision pretending to be instrumentation. Find both.

Diagnosis

Defect 1: c is const, so increment() — a non-const method — cannot be called through it (compile error, correctly). Defect 2: getCount() mutates (accesses++), so it cannot be const — and because it isn’t, even a read like c.getCount() through a const object is refused. The design lie: a “getter” with a side effect is a command wearing a query’s name. Honest fixes: drop the counter (the Debugging module’s YAGNI), or split — a const getCount() and a separate non-const int getAndLogCount(). The lesson: the const system exposes intent mismatches; when it complains, redesign rather than strip const.


D4 — The destructor that fires too late to matter

#include <iostream>
using namespace std;

class Leak {
public:
    Leak() { data = new int[100]; cout << "acquired\n"; }
    ~Leak() { delete[] data; cout << "released\n"; }
private:
    int* data;
};

void process(Leak copyMe) {         // ← suspect signature
    cout << "processing\n";
}

int main() {
    Leak obj;
    process(obj);
    cout << "done\n";
    return 0;
}

Run it. The output shows two “acquired”? No — one “acquired”, but two “released”. Explain every line, then name the failure and the course-level rule.

Diagnosis

process takes Leak by value — the parameter is a copy of obj, and copying copies the pointer: two objects, one heap block (Lesson 2’s scope note, live). The copy’s destructor runs at the end of process (“released” #1) and frees the block; obj’s destructor runs at main’s end (“released” #2) and frees the same block again — undefined behaviour. (Only one “acquired” prints because the copy is pointer-deep, not resource-deep.) Course-level rule: classes that own raw resources pass by reference/const& — and the full machinery (copy constructor, rule of three) is the next course’s opening story, now with a felt reason to care.


D5 — The setter that trusts its parameter name

class Student {
public:
    void setName(string name) {
        name = name;                // ← suspect
    }
    string getName() const { return name; }
private:
    string name = "Unnamed";
};

int main() {
    Student s;
    s.setName("Aisha");
    cout << s.getName() << "\n";    // prints: Unnamed
    return 0;
}

Why does setName("Aisha") leave the name untouched, and what are the two cures — plus the course’s preferred one?

Diagnosis

The parameter name shadows the member name, so name = name; assigns the parameter to itself; the member never hears about “Aisha”. -Wshadow (under -Wextra) warns about the shadowing; some compilers warn about self-assignment. Cures: (1) rename the parameter — void setName(const string& newName) — the course’s preference, because names are documentation and shadowing means the naming failed; (2) this->name = name; — correct but routine use of this-> as a disambiguator usually signals the rename was the real fix. (While you’re in there: const string& for the parameter — S11’s cost rule.)


D6 — The validator on the wrong door

class Exam {
public:
    Exam(int totalMarks) { total = totalMarks; }
    void setTotal(int t) { if (t > 0 && t <= 500) total = t; }
    int getTotal() const { return total; }
private:
    int total = 0;                  // default 0 — "safe"
};

int main() {
    Exam e(-100);                   // birth with nonsense
    e.setTotal(120);
    cout << e.getTotal() << "\n";   // prints 120 — so where's the bug?
    return 0;
}

The setter validates; the output looks right. State precisely when the class’s invariant “0 < total ≤ 500” is broken — and why the constructor is the guilty door.

Diagnosis

The invariant is broken between construction and the first setter call: Exam e(-100) exists with total = -100, because the constructor — the other door — validates nothing. Between those two lines, getTotal() returns −100 to any caller; the setter’s guard is a moat around a gate that was left open at birth. Fix: validate in the constructor too (if (t > 0 && t <= 500) total = t; else total = 0;) — or better, delegate both doors to one guard (Lesson 2’s delegating constructors), so the invariant holds at every moment of the object’s life, not just after the first setter. Meta-lesson: every path that writes an attribute must enforce the invariant — the Debugging module’s boundary rule, pointed at constructors.


D7 — The composition that forgot to initialize

class Engine {
public:
    Engine(int hp) : horsepower(hp) {}
    int getHorsepower() const { return horsepower; }
private:
    int horsepower;
};

class Car {
public:
    Car(const string& m) : model(m) {}     // ← suspect
    void honk() const { cout << model << " says beep\n"; }
    Engine engine;                          // public "for convenience"
private:
    string model;
};

int main() {
    Car car("Civic");
    cout << car.engine.getHorsepower() << "\n";
    return 0;
}

Two design failures: one won’t compile, one is a wall missing. Find both, then fix.

Diagnosis

Failure 1 (compile error): Car’s initializer list never initializes engine, and Engine has no default constructor — the compiler cannot build a Car because the member can’t be born. Fix: Car(const string& m, int hp) : model(m), engine(hp) {} — the contained object is constructed in the outer object’s initializer list (Lesson 3’s composition mechanics). Failure 2 (design): engine is public — the has-a member is exposed, so any code can (attempt) engine surgery outside the class, and the Car’s invariants about its own engine are unenforceable. Fix: private: the member, expose behaviour (getHorsepower() const relay) if the interface genuinely needs it. The lesson: composition members are interior — they are born by the constructor and hidden by private:, exactly like flat attributes.


D8 — The derived data that drifted

class Student {
public:
    void setMark(int quiz, int m) {
        if (quiz >= 0 && quiz < 3 && m >= 0 && m <= 100) marks[quiz] = m;
        average = (marks[0] + marks[1] + marks[2]) / 3;   // ← two bugs live here
    }
    double getAverage() const { return average; }
private:
    int marks[3] = {-1, -1, -1};
    double average = 0;
};

int main() {
    Student s;
    s.setMark(0, 80);
    cout << s.getAverage() << "\n";   // expected 80, got -0.33... 
    return 0;
}

Why does the average go negative, and what does the fix (the Records module’s rule) delete from the class entirely?

Diagnosis

average is recomputed over all three slots, including the two still holding the −1 sentinel: (80 + −1 + −1)/3 with integer division = 26, then stored as 26.0 — and before any mark is set, (−1−1−1)/3 = −1. The deeper bug is architectural: average is derived data, and storing it guarantees drift (the Records module’s “derived Grade never stored”, the Files module’s same rule). Fix: delete the average attribute entirely; replace with double average() const that sums only entered marks and guards the empty case (E6’s solution). The class then cannot drift — there is nothing to drift. Meta-lesson: a stored copy of something computable is a second fact that must be kept true forever; compute instead.


D9 — The method that broke the chain

class Builder {
public:
    Builder& addPart(const string& p) { parts.push_back(p); return *this; }
    Builder finish() {                 // ← suspect return type
        cout << "finished with " << parts.size() << " parts\n";
        return *this;                  // copies *this* — then the copy dies...
    }
private:
    vector<string> parts;
};

int main() {
    Builder b;
    b.addPart("wheel").addPart("engine").finish().addPart("spoiler");
    return 0;
}

What’s wrong with finish()’s contract — and what did the trailing .addPart("spoiler") actually append to?

Diagnosis

finish() returns Builder by value — a copy of the object. The trailing .addPart("spoiler") therefore appends to the temporary copy, which is destroyed at the end of the statement: the spoiler vanishes; b keeps two parts. (This is E17/S17’s value-vs-reference return, weaponized by chaining.) Fix by design, not just signature: finish() is a terminal action — it should return void (or the product it finishes), and the chain should end there. The rule: return *this; is only meaningful through a reference return; and any method whose name says “this is the end” shouldn’t invite another . after it.


D10 — The audit: three bugs, one class

class LibraryBook {
public:
    LibraryBook(string t) { title = t; }          // line A
    bool borrow() {
        if (status == Borrowed) return false;
        status = Borrowed;
        return true;
    }
    bool giveBack() {
        status = Available;                        // line B
        return true;
    }
    string title;                                  // line C
private:
    enum Status { Available, Borrowed };
    Status status = Available;
};

Find all three defects before reading the list — classify each as compile bug, invariant hole, or design smell.

Diagnosis

Line C — invariant hole: title is public (above no private: label… it is above it — placed before the label), so the title can be rewritten mid-loan; an attribute with no reason to change after construction should be set once by the constructor and hidden. Line B — invariant hole: giveBack() doesn’t check that the book is borrowed — “returning” an Available book reports success (compare S26’s guarded transitions; the one-way doors must check the current room before opening). Line A — design smell + inefficiency: the constructor takes string by value and assigns (copy then move at best), instead of const string& t with an initializer list (: title(t)) — Lesson 2’s initializer rule plus S11’s cost rule; it also fails to state any validation the title might need. Verdict order (Debugging module): compile issues → invariant holes → hygiene.


Fix-list recap

Hunt Bug class Prevention rule
D1 label placement leak attribute placement is the design
D2 constructor with return type constructors have no return type
D3 query with side effects getters are const and pure
D4 by-value copy of a resource owner resource owners pass by reference
D5 parameter shadows member rename before reaching for this->
D6 unvalidated constructor door every write path validates
D7 uninitialized composed member has-a members are born in the initializer list
D8 stored derived data compute, never store
D9 chain broken by value return *this needs a reference return
D10 three-for-one audit audit: compile → invariants → hygiene

Where next

— Engr. Dr. Muhammad Nadeem Majeed, Professor, Department of Data Science (PUCIT), University of the Punjab, Lahore · About the instructor