Lesson 3 — Abstract Classes, Interfaces, and the Composition Decision

← Module home · ← Lesson 2 — virtual and runtime polymorphism

In this lesson you will learn


1. The problem abstract classes solve

Lesson 2’s Shape was usable — Shape s; compiled, with area() answering 0. That’s a design leak: no honest shape has no area; “0” is a lie waiting in every future collection. The base class exists to be inherited from, not to be instantiated — and C++ lets you say exactly that:

class Shape {
public:
    virtual double area() const = 0;     // PURE virtual: "= 0" means "no body here — refine me"
    virtual ~Shape() = default;
    void describe() const {              // non-virtual: shared, exact
        cout << "area = " << area() << "\n";
    }
};

// Shape s;                 // ← COMPILE ERROR: Shape is abstract
// new Shape();             // ← same error

class Circle : public Shape {
public:
    double area() const override { return 3.14159265358979 * r * r; }
private:
    double r;
};

class Triangle : public Shape { /* no area() override... */ };
// Triangle t;              // ← COMPILE ERROR: Triangle is still abstract (didn't refine area)

Pure virtual (= 0) declares a function with no implementation in this class — a contract the class’s children must fulfil. A class with any pure virtual function is abstract: it cannot be instantiated; it can only be inherited. The compiler becomes the enforcer of the contract: any derived class that fails to override every pure virtual remains abstract itself — the “you forgot something” is now a compile error instead of a runtime 0.

Abstract bases may still have: non-virtual methods with bodies (describe — shared code calling the hooks), attributes, constructors (they run as the base step of derived construction — Lesson 1’s order), and a virtual destructor. Pure virtual functions may even have a body (called explicitly as Shape::area() — a default implementation subclasses may invoke); the “= 0” forbids instantiation, not implementation. At this course’s level, keep pure virtuals bodyless and reserve shared code for non-virtuals.


2. Interfaces — the concept, and its two C++ idioms

An interface is a pure contract: what you can ask of an object, with no data and no behaviour of its own. Classes across the program agree on it, and code written against the interface works with every implementer — the polymorphic gallery loop, promoted to a design principle.

Idiom 1 — the pure-abstract interface class:

class Printable {
public:
    virtual void print(ostream& out) const = 0;
    virtual ~Printable() = default;
};

class Invoice : public Printable {
public:
    void print(ostream& out) const override { out << "INVOICE #" << number << "\n"; }
private:
    int number = 1;
};

// works with EVERY Printable, present and future:
void printAll(const vector<Printable*>& docs) {
    for (const Printable* d : docs) d->print(cout);
}

Conventions that mark the idiom: name interfaces for capability (Printable, Saveable, Comparable); no attributes; all functions pure virtual; a virtual destructor; multiple inheritance of interfaces is safe and common (a class can be Printable and Saveable — pure contracts carry no state to conflict). Heavy multiple inheritance of implementation classes is the tangle this course skips; you should be able to say why the interface case is different (nothing is inherited but promises).

Idiom 2 — the one you already own: operator<< via the hook.

ostream& operator<<(ostream& out, const Printable& p) {
    p.print(out);
    return out;
}
// cout << invoice; works for every current and future Printable

The OOP module’s operator<< pattern becomes generic over the hierarchy: one operator, infinite implementers. This is the exact architecture of the mini-project’s report layer.


3. Composition vs inheritance — the decision, in full

The OOP module’s field guide gets its final table. Both mechanisms route calls to other code; they encode different relationships, and the wrong one calcifies:

  Inheritance (is-a) Composition (has-a)
Sentence “Dog is an Animal” “Car has an Engine”
Binds derived to base forever (compile-time, fixed) held by reference — swappable at runtime
Exposes the base’s interface plus (via protected) its interior only what the wrapper chooses to expose
Reuse comes with substitutability obligations comes with zero obligations
Breaks when base changes (all children feel it — the fragile base class) the wrapped class changes its contract (rare — that’s why interfaces exist)
Test Liskov: base everywhere ⇒ derived everywhere no test — any use is legal

The decision procedure

  1. Run the is-a test — in writing. “X is a Y” spoken as a full sentence, then the substitutability check: can X appear everywhere Y appears, keeping every promise? Fail or hesitate ⇒ inheritance is wrong, whatever the reuse savings.
  2. Hesitating between is-a and has-a? Choose has-a. (The course’s standing heuristic — “favour composition” — is not a fashion: composites stay swappable and base changes stay local.)
  3. Is the variation kind or degree? Kinds (Circle/Rect/Triangle — different rules for the same question) → inheritance from an abstract base. Degrees (an account with a fee schedule value) → a composed strategy object (the Payment lab makes you feel both).
  4. Will the family grow? Expecting new kinds monthly ⇒ an interface earns its abstraction. A stable pair of classes ⇒ maybe neither mechanism; two honest classes with one shared free function beat a ceremony hierarchy.
  5. Need to swap behaviour at runtime? Composition with an interface reference (PaymentMethod* switchable per checkout — Lab 3) — inheritance cannot re-pick a base class after birth.

The two worked cases you will meet in the labs


  1. Inheriting for code reuse alone. The Stack : Vector classic. Symptom: the derived class exposes methods that break its own rules. Cure: composition + a thin interface.
  2. Fat base classes. A base with twenty methods where subclasses override two and are forced to stub eighteen. Symptom: // does nothing everywhere. Cure: split the interface; small contracts (Printable) compose.
  3. protected attributes as a habit. Every subclass now co-owns the base’s invariants (Lesson 1 §4). Symptom: invariant bugs that move between classes. Cure: private data + protected guarded hooks.
  4. Non-virtual destructors on polymorphic bases. The delete-through-base leak (Lesson 2 §4). Cure: the no-exceptions rule.
  5. God hierarchies. One base (“Object”, “Manager”, “Data”) that everything inherits because it’s convenient. Symptom: the hierarchy diagram needs a legend. Cure: relationships must each pass the is-a test individually — convenience is not a relationship.
  6. Overriding without override. The typo that silently hides (D3). Cure: the keyword, always.
  7. Slicing by container. vector<Shape> of mixed shapes (Lesson 2 §3). Cure: pointers (smart ones, next course).
  8. Virtual everything. Marking every method virtual “for flexibility” — a vtable on a class with two children, and a base interface nobody abstracts. Cure: virtual is a design decision (polymorphic intent), not a default.
  9. Deep hierarchies. Five levels of single inheritance where two sufficed; the middle layers exist to pass data through. Symptom: “who actually implements this?” spelunking. Cure: prefer two shallow families plus composition over one deep family.
  10. Refused-to-abstract — the mirror error. Ten classes each with if (kind == CIRCLE) ... else if (kind == RECT) ... — the kind enum doing polymorphism’s job by hand (the switch the virtual table automates). Symptom: every new kind edits every switch. Cure: that’s the is-a family Lesson 2 built; use it.

The meta-rule tying the gallery together: every inheritance decision must pass the is-a test in a spoken sentence, and every hierarchy earns its depth one justified level at a time. The design problems grade exactly this discipline.


Check yourself

Where next

— Engr. Dr. Muhammad Nadeem Majeed, Professor, Department of Data Science (PUCIT), University of the Punjab, Lahore · About the instructor