Debugging — 10 seeded hunts
← Module home · Each snippet compiles (or nearly) but misbehaves. Predict the symptom, form a hypothesis, then read the separated diagnosis. Compile with
-Wall -Wextra— a few of these announce themselves.
D1 — The override that never fires
#include <iostream>
using namespace std;
class Animal {
public:
void speak() const { cout << "generic sound\n"; }
};
class Dog : public Animal {
public:
void speak() const { cout << "Woof\n"; } // intended as an override
};
int main() {
Dog d;
Animal* a = &d;
a->speak();
return 0;
}
The programmer expected “Woof”. What prints, which single keyword fixes it, and which second keyword makes the compiler the guardian?
Diagnosis
Prints “generic sound”: speak is non-virtual, so the call through Animal* follows the pointer’s type at compile time — Dog’s version is mere name-hiding, invisible through the base window. Fix: virtual void speak() const in Animal. Guardian: override on Dog’s speak — with it, the compiler would have failed the build the moment Animal::speak lost its virtual (“only virtual member functions can be marked ‘override’”), turning this silent bug into a loud one. The pair — virtual in the base, override in the derived — is the module’s standing rule.
D2 — The collection that shrank
#include <iostream>
#include <vector>
using namespace std;
class Shape {
public:
virtual double area() const { return 0.0; }
virtual ~Shape() = default;
};
class Circle : public Shape {
public:
Circle(double r) : r(r) {}
double area() const override { return 3.14159265358979 * r * r; }
private:
double r;
};
int main() {
vector<Shape> shapes;
shapes.push_back(Circle(2.0));
cout << shapes[0].area() << "\n"; // expected 12.5664
return 0;
}
Why does the correct code print 0, and what two containers fix it?
Diagnosis
Slicing: push_back(Circle(2.0)) into a vector<Shape> copies only the Shape part of the Circle — the r member and the Circle’s vptr never survive the by-value copy. shapes[0] is a genuine (plain) Shape: area() answers 0, no warning. Fixes: vector<Shape*> shapes; shapes.push_back(new Circle(2.0)); — addresses keep whole objects (with the ownership loop that implies, E14) — or, next course, vector<unique_ptr<Shape>>, which automates exactly that ownership. The container type is a design decision about identity: store values ⇒ uniform base objects; store addresses ⇒ polymorphic family.
D3 — The typo that hid
class Resource {
public:
virtual void load(const string& path) { /* ... */ }
virtual ~Resource() = default;
};
class Image : public Resource {
public:
void load(const string& path) override { /* ... */ } // A
// ...later, during a "quick refactor"...
void lode(const string& path) override { /* ... */ } // B — the "fix"
};
int main() {
Image img;
Resource* r = &img;
r->load("photo.png"); // which version runs? and which line failed the build?
return 0;
}
Line B was meant to replace line A. What fails to compile, and what would have shipped if line A had been quietly deleted instead of renamed?
Diagnosis
Line B fails to compile: lode overrides nothing (override checks), so the compiler names the error immediately — the keyword doing its job. The dangerous alternative: delete A entirely, ship B with override removed — then r->load(...) runs Resource::load’s body (an empty stub, or worse, base logic) for every Image, forever, with no diagnostic anywhere. The lesson generalizes: override is to hierarchies what -Wall is to locals — you pay one keyword to be told about a whole bug family.
D4 — The leak through the base pointer
#include <string>
using namespace std;
class Job {
public:
Job() { cout << "Job acquired\n"; }
~Job() { cout << "Job released\n"; }
};
class PrintJob : public Job {
public:
PrintJob() : pages(new int[64]) { cout << "PrintJob acquired\n"; }
~PrintJob() { delete[] pages; cout << "PrintJob released\n"; }
private:
int* pages;
};
int main() {
Job* j = new PrintJob();
delete j;
return 0;
}
What prints, what leaks, which keyword fixes it, and which combination of properties makes this bug class uniquely nasty?
Diagnosis
Prints “Job released” only: delete through Job* follows the pointer’s type — ~PrintJob never runs, so pages’ 64 ints leak every time (and the base-part-only destroy is formally undefined behaviour). Fix: virtual ~Job() — then ~PrintJob runs (releasing pages), then ~Job, the Lesson 1 death order. The nasty combination: the bug is silent (no error), intermittent (only paths deleting through base pointers leak), and located elsewhere (the leak surfaces in the profiler, not at the delete site). Hence the course’s no-exceptions rule: polymorphic base ⇒ virtual destructor, every time.
D5 — The base class that forgot itself
class Account {
protected:
long long balance = 0;
public:
bool withdraw(long long amount) {
if (amount <= 0 || amount > balance) return false;
balance -= amount;
return true;
}
};
class ChequeAccount : public Account {
public:
void bounce() { balance = -5000; } // "overdraft facility"
void cheatFix() { balance = 0; } // "reset for testing"
long long getBalance() const { return balance; }
};
The Account invariant (“balance changes only through guarded withdrawal”) is dead. Name the design mistake, its blast radius, and the two-step cure.
Diagnosis
The mistake: protected attributes as a habit (gallery #3) — balance under protected made every subclass a co-owner of the invariant, and two lines of “convenience” killed it (balance = -5000 bypasses every rule; the subclass doesn’t even need malice). Blast radius: now and future — every class that ever inherits Account can rewrite the balance, and debugging the invariant means searching the whole family. Cure, two steps: (1) private long long balance; — the wall returns; (2) expose a guarded hook: protected: void setBalanceHard(long long b) { if (b >= -overdraftLimit) balance = b; } — the overdraft facility becomes a rule the base enforces, not a hole the subclass digs. Lesson: protected methods can carry rules; protected attributes carry hope.
D6 — The overload family that vanished
#include <iostream>
using namespace std;
class Logger {
public:
void log(const string& msg) { cout << "MSG: " << msg << "\n"; }
void log(int code) { cout << "CODE: " << code << "\n"; }
};
class FileLogger : public Logger {
public:
void log(const string& msg) { cout << "[file] MSG: " << msg << "\n"; } // refine one
};
int main() {
FileLogger f;
f.log("start");
f.log(42); // expected: CODE: 42
return 0;
}
The log(int) worked before FileLogger existed. Why doesn’t it now, and what one line restores it?
Diagnosis
FileLogger’s log(const string&) hides all base overloads of log (Lesson 1 §3) — name lookup stops at the derived class once the name is found, so f.log(42) sees only the string overload; the int argument converts via string’s integer constructor, and it prints MSG: 42 — the wrong function, silently. One-line fix: using Logger::log; in FileLogger’s public section — the base overloads rejoin the lookup, and both behaviours coexist (CODE: 42 restored). Rule: adding any overload of a base’s name in a derived class requires the using declaration unless hiding is the intent.
D7 — The constructor that skipped a step
#include <iostream>
#include <string>
using namespace std;
class Employee {
public:
Employee(const string& name) : name(name) {}
const string& getName() const { return name; }
private:
string name;
};
class Manager : public Employee {
public:
Manager(int reports) { this->reports = reports; } // ← suspect
int getReports() const { return reports; }
private:
int reports = 0;
};
int main() {
Manager m(5);
cout << m.getName() << "\n";
return 0;
}
This doesn’t compile. What exactly is missing, what does the compiler say, and what is the fix — including the variant if Employee had both a default and a parameterized constructor?
Diagnosis
Manager’s initializer list never mentions the base, so the compiler seeks Employee’s default constructor — which doesn’t exist (a user constructor suppresses the implicit one). Error: “no matching constructor for initialization of ‘Employee’“. Fix: Manager(const string& name, int reports) : Employee(name), reports(reports) {} — the base is constructed in the initializer list, Lesson 1’s rule. Variant: with Employee() = default; present, the original would compile — name born empty — which is worse: a manager who exists nameless. The base-part-must-be-built rule doesn’t shrink when a default appears; the design question “what must every Manager know at birth?” still has the answer its name.
D8 — The virtual everything class
class StringBox {
public:
virtual size_t length() const { return s.size(); } // virtual #1
virtual bool empty() const { return s.empty(); } // virtual #2
virtual char at(size_t i) const { return s[i]; } // virtual #3
virtual void clear() { s.clear(); } // virtual #4
virtual ~StringBox() = default;
protected:
string s;
};
// Used exclusively as: StringBox box; box.length(); box.at(3); ...
// No subclass exists. None is planned.
Nothing here is wrong — diagnose the design debt: what each virtual costs, what the protected member promises, and the shape of the honest version.
Diagnosis
Debt, not bug: (1) each virtual is a promise that subclasses will vary the method — with zero subclasses, it’s four unfulfilled promises (vtable overhead is trivial; the design noise is the cost — every reader hunts for the family that isn’t coming); (2) protected: string s promises all future subclasses will maintain StringBox’s invariants (D5’s blast radius) for no benefit yet. Honest shape: a plain class — all private, all non-virtual, destructor unvirtual — until a second kind of box actually exists. The rule behind the drill: virtual and protected are design decisions with recurring costs; make them when the variation arrives (gallery #8). The counter-case to know: Shape earned its virtuals by having children on day one.
D9 — The hierarchy that argued with a bool
#include <iostream>
using namespace std;
class BaseEntity {
public:
BaseEntity(const string& id) : id(id) {}
virtual bool isValid() const { return !id.empty(); }
virtual ~BaseEntity() = default;
protected:
string id;
};
class Invoice : public BaseEntity {
public:
Invoice(const string& id, long long amount) : BaseEntity(id), amount(amount) {}
bool isValid() const override { return BaseEntity::isValid() && amount > 0; } // ← the line
private:
long long amount;
};
int main() {
Invoice bad("", -5);
cout << boolalpha << bad.isValid() << "\n"; // expected: false. prints: ?
return 0;
}
This one actually works — the exercise is explaining why the explicit BaseEntity::isValid() call is the load-bearing piece. Remove it (mentally) and re-trace. Then name the mistake class when someone writes isValid() const override { return isValid() && amount > 0; }.
Diagnosis
With the explicit qualification: base check (id non-empty? false) && amount check → false, correct. Without the BaseEntity:: qualification, isValid() inside Invoice::isValid resolves to… itself — unqualified name lookup finds the nearest declaration, which in Invoice’s scope is Invoice::isValid. That’s infinite recursion: stack overflow at runtime, on any call — the compile passes, the tests pass for the other branch (amount ≤ 0 short-circuits before the recursion? no: isValid() && amount > 0 calls isValid first — it dies on every call). Mistake class: calling an override through its own name expecting the base version — the base must be qualified (BaseEntity::isValid()) or reached via a different name. Compare S12’s describe() calling virtual area(): there the unqualified call was correct (dispatch was the intent); here identity is the bug — same syntax, opposite intent, and the distinguishing question is “which function did I mean?”
D10 — The audit: three bugs, one hierarchy
class Shape {
public:
double area() const { return 0; } // line A
void describe() const { cout << area() << "\n"; }
};
class Square : public Shape {
public:
Square(double side) { this->side = side; } // line B
double area() const { return side * side; }
private:
double side;
};
int main() {
Square* s = new Square(4.0);
Shape* p = s;
p->describe(); // expected: 16
vector<Shape> kept;
kept.push_back(*s); // line C
delete s;
return 0;
}
Find all three defects before reading the list — classify each: dispatch bug, construction bug, or storage bug.
Diagnosis
Line A — dispatch bug: area is non-virtual, so p->describe() prints 0 (the Shape window answers; Square’s override hides). Fix: virtual double area() const in Shape, override in Square — and since Shape is now a polymorphic base, a virtual ~Shape() = default; is the rule-with-no-exceptions rider. Line B — construction bug: this->side = side works (D7’s disambiguator) but skips the initializer list — style debt at best; the real danger it suggests is the D7 pattern (forgetting the base pass-through when the base gains a constructor). Fix: Square(double side) : side(side) {} — same name, initializer list, no shadow dance. Line C — storage bug: vector<Shape> + push_back(*s) slices the Square into a plain Shape (kept[0].area() would print 0); the delete s afterward is also a leak-in-waiting with no virtual destructor in force. Fix: store pointers (vector<Shape*> + explicit ownership, or unique_ptr next course) and never copy derived objects by base value. Verdict order: dispatch → construction → storage, same audit order as every pack.
Fix-list recap
| Hunt | Bug class | Prevention rule |
|---|---|---|
| D1 | hiding ≠ overriding | virtual + override, always |
| D2 | by-value storage slices | mixed families live behind pointers |
| D3 | typo-override ships silent | override makes the compiler the reviewer |
| D4 | non-virtual base destructor | polymorphic base ⇒ virtual destructor |
| D5 | protected attributes co-owned | guarded protected methods, not open data |
| D6 | overload family hidden | using Base::name; when adding overloads |
| D7 | base part never initialized | base construction lives in the initializer list |
| D8 | speculative virtual/protected | decide when the variation arrives |
| D9 | unqualified self-call in an override | qualify base calls; name the intent |
| D10 | three-for-one audit | dispatch → construction → storage |
Where next
- Design problems: ten is-a judgements on paper.
- Labs: five hierarchies, built honestly.
— Engr. Dr. Muhammad Nadeem Majeed, Professor, Department of Data Science (PUCIT), University of the Punjab, Lahore · About the instructor