Exercises — 20 drills, two parts

← Module home · Attempt before opening solutions — separated below each part. Compile with -Wall -Wextra; several drills become compiler conversations.

Part A — Operator overloading (E1–E10)

Solutions A

S1. Money-pattern non-member: Duration operator+(const Duration& a, const Duration& b) { return Duration(a.getSeconds() + b.getSeconds()); } — the naked call compiles and matches, proving the costume (Lesson 1 §1’s whole point in one line).

S2. Duration& operator+=(const Duration& rhs) { seconds += rhs.seconds; return *this; } and + becomes Duration r(a); r += b; return r; — the one-authoritative-logic idiom. Chaining verified: the reference return keeps (d1 += d2) += d3 on one object.

S3. ostream& operator<<(ostream& out, const Duration& d) { long long m = d.getSeconds() / 60, s = d.getSeconds() % 60; out << (m < 10 ? "0" : "") << m << ":" << (s < 10 ? "0" : "") << s; return out; } — padding by hand (the Foundations module’s string-vs-number lesson), stream returned.

S4. Ground truth: == and < on seconds; derived: != = !(a==b), > = b<a, <= = !(b<a), >= = !(a<b) — six operators, two lines of raw logic. With a converting constructor, both d == 75 and 75 == d compile (non-members convert either side); with explicit, both fail — the explicit overload pairs (==(const Duration&, long long) and its swap) are then the honest door, and the rule: decide the conversion policy first, write the comparison set to match, test both orders.

S5. istream& operator>>(istream& in, Duration& d) { long long s; if (in >> s) d = Duration(s); return in; } — the commit-on-success rule; after feeding abc, d is unchanged because in >> s failed before any assignment. (The Files module’s read-in-condition, parameter scale.)

S6. The reference binds to the local r, which dies at return — a dangling reference; the symptom appears at the caller (reading the destroyed object: garbage, intermittently correct, anything — UB). Correct families: value-returning binary arithmetic — Money operator+(const Money&, const Money&); and reference-returning only where the object outlives the call — Money& operator+=(...) { ...; return *this; } and stream operators returning their stream parameter.

S7. bool operator==(const Fraction& a, const Fraction& b) { return a.num * b.den == b.num * a.den; } and < similarly cross-multiplied (positive denominators assumed — validated at birth: den > 0, else reject/negate both, documented). Tests: (1,2)==(2,4) true; (1,3) < (1,2) — 1·2 < 1·3 → true. Note the honest limitation: cross-multiplication can overflow big numerators — the comment naming the boundary is part of the answer.

S8. operator<< is forced non-member: its left operand is ostream& — a type you cannot reopen to add members. operator[] is forced member: the language requires it, because subscripting must access the object’s own interior (and its left operand is the object). Opposite requirements, same cause: who owns the left operand?

S9. operator- (binary) and == as non-members; 2 * v must be a non-member (the left operand is a scalar — members can’t serve it); v * 2 may be a member or non-member (write the non-member pair for symmetry, or keep the member and add one non-member — state the choice); unary - is naturally a member (Vector2 operator-() const { return Vector2(-x, -y); }). + mirrors -. The full set with explicit-free… note: Vector2 takes two arguments, so no one-arg conversion issue — a small designed-in mercy worth noticing.

S10. The member’s left operand is fixed as Temperature — 36.6 == temp needs a Temperature on the left, and explicit blocks the silent double → Temperature conversion that would have made the non-member pair work without overloads. Redesign: keep explicit, add the non-member pair bool operator==(const Temperature&, double) and bool operator==(double, const Temperature&) — both express the same ground truth through one helper (bool equalsC(double c) const). The sentence: explicit conversions plus symmetric comparison = write both orders deliberately; implicit conversions plus non-members = one overload serves both.

Part B — Templates (E11–E20)

Solutions B

S11. // Contract: T supports operator< (strict weak ordering) — the body (a < b) ? a : b demands exactly that; stamps verified for three types. The comment is the discipline (Lesson 2 §3’s step 1).

S12. Implicit: myMin(3, 9) deduces T=int. Explicit: myMin<int>(3, 9) names it (needed when deduction can’t agree, e.g. mixed literals). The sentence: a template is a pattern; each distinct T used generates a fresh ordinary function from it — the genericity is spent at compile time, before the program runs.

S13. T absMax(const T& a, const T& b) { T za = a < T(0) ? -a : a; T zb = b < T(0) ? -b : b; return za < zb ? zb : za; } — demands: < (twice), unary -, construction from T(0) (a zero value), copy construction/assignment (the locals). The point: the contract grew from one operation to four — frugality is genericity (Lesson 2 §3’s step 2), and the comment must list all four.

S14. myMin(3, 4.5): deduction finds T=int from arg 1 and T=double from arg 2 — no single T, compile error. Cures: myMin(3.0, 4.5); myMin<double>(3, 4.5); or template <typename A, typename B> A myMin2(const A& a, const B& b) { return a < b ? a : b; } — return type A (the first parameter’s type) is the honest choice because the smaller value is returned as one of the two argument types and the caller names the conversion they want; a “common type” computation exists next course.

S15. The template demands < and ==… precisely: the body compares arr[i] > threshold — so the contract is > (or < flipped), plus copying for the reference parameter. Money needed operator> (which Lesson 1’s derivation from < supplies): int count = 0; for (int i = 0; i < n; i++) if (threshold < arr[i]) count++; — written with < only, so Money’s existing < suffices. The design note: choosing <-only spelling kept the contract at one operation — the frugality principle in action.

S16. T max() const { if (count == 0) throw out_of_range("Box::max"); const T* best = &data[0]; for (int i = 1; i < count; i++) if (best[0] < data[i]) best = &data[i]; return *best; } and contains: linear with ==. Head comment: “T requires: < (strict weak order) for max; == for contains; copyable for add.” — three named requirements, testable independently.

S17. Box<const char*> compares pointers — contains("hi") checks whether the same address is stored (usually false even when equal text exists); Box<string> compares values (== on string compares characters). The rule: generic containers hold values (string), not raw pointers to literals — and when pointers are unavoidable, the comparator must dereference (next course’s comparator vocabulary).

S18. template <typename T> void swapValues(T& a, T& b) { T tmp(a); a = b; b = tmp; } — demands copy construction (T tmp(a)) and copy assignment (twice). A resource-owning T whose copies share resources (the SessionLog of the Inheritance module’s D4) poisons the swap: copies alias one block, double-delete at death. The generalization: a template’s requirements include the type’s copy semantics — generic code is only as safe as the least safe T it serves.

S19. template <typename T, int N> class FixedArray { public: FixedArray() {} const T& at(int i) const { if (i < 0 || i >= N) throw out_of_range("FixedArray"); return data[i]; } static constexpr int size() { return N; } private: T data[N]; }; — no heap, size in the type. FixedArray<Box<int>, 3> demands of Box<int>: default-constructible (the array’s elements are born) and copy-assignable (at returns refs; assignment inside the array if ever moved) — the Lesson 2 scope note’s “stamps compose,” now with the requirement spelled.

S20. Contract: “T must be copy-constructible (return by value) and support array indexing; n >= 1 required; for n == 0 the function throws.” Guard: if (n <= 0) throw out_of_range("middle: empty"); return arr[n / 2];. The design question: const T& is legal only when the array outlives the use of the reference — for middle(arr, n) reading immediately, it’s fine and cheaper; stored or returned further, it dangles if the caller passed a temporary array. The honest answer states both shapes — the reference-return question from the Inheritance module (S17), one last appearance.

Where next

— Engr. Dr. Muhammad Nadeem Majeed, Professor, Department of Data Science (PUCIT), University of the Punjab, Lahore · About the instructor