Predict the Output — Decisions
How to work: for each program, write your predicted output by hand — a trace table for the trickier ones — before opening the answers at the bottom of the page. If your prediction disagrees with the compiler, the explanation is the lesson; find which line of your mental model was wrong. Input is shown as input → lines where the program reads.
P1 — The polite ladder
int marks = 73;
if (marks >= 80)
std::cout << "A\n";
else if (marks >= 70)
std::cout << "B\n";
else if (marks >= 60)
std::cout << "C\n";
else
std::cout << "F\n";
P2 — Boundary sandwich
int age = 18;
if (age > 18)
std::cout << "adult\n";
else
std::cout << "young\n";
P3 — Two ifs, not a ladder
int marks = 85;
if (marks >= 40)
std::cout << "Pass\n";
if (marks >= 80)
std::cout << "Distinction\n";
P4 — The ordered ladder
int marks = 79;
if (marks >= 70)
std::cout << "B\n";
else if (marks >= 80)
std::cout << "A\n";
else
std::cout << "C\n";
P5 — Fallthrough audit
int level = 2;
switch (level)
{
case 1: std::cout << "one\n";
case 2: std::cout << "two\n";
case 3: std::cout << "three\n";
break;
case 4: std::cout << "four\n";
break;
default: std::cout << "other\n";
}
P6 — The char router
char c = 'B';
switch (c)
{
case 'a': std::cout << "lower a\n"; break;
case 'A': std::cout << "upper A\n"; break;
case 'B': std::cout << "upper B\n"; break;
default: std::cout << "unknown\n";
}
P7 — The chained comparison
int age = 45;
if (13 <= age <= 19)
std::cout << "teen\n";
else
std::cout << "not teen\n";
P8 — AND before OR
int age = 16; bool hasPass = false;
if (age < 18 || age > 65 && hasPass)
std::cout << "allowed\n";
else
std::cout << "denied\n";
P9 — The ternary print
int marks = 55;
std::cout << (marks >= 40 ? "PASS" : "FAIL") << '\n';
bool passed = marks >= 40;
std::cout << passed << '\n';
P10 — Short-circuit guard
int count = 0;
int total = 100;
if (count != 0 && total / count > 10)
std::cout << "high average\n";
else
std::cout << "no average\n";
Answers
Click only after predicting all ten
P1 — B. The ladder asks >= 80 first: false (73). Then >= 70: true → B, and the rest of the ladder is skipped even though >= 60 would also be true. First-true wins (Lesson 1 §5).
P2 — young. 18 is not greater than 18 — > excludes the boundary; the else takes it. If the requirement were “18 counts as adult”, the condition needed >=. The 39/40/41 test in miniature.
P3 — Pass then Distinction. Two independent ifs: the second runs even after the first succeeded — 85 qualifies for both. Replace the second if with else if and only Pass prints. Knowing which structure you want is the design decision.
P4 — B, and that’s a bug-shaped answer. 79 passes >= 70 and prints B — correct for this input. But 85 also prints B: the >= 80 question is unreachable, because everything ≥ 80 is also ≥ 70. Un-ordered ladders don’t crash; they quietly misclassify. This is D4 in prediction form.
P5 — two\nthree. Enters at case 2, prints two, then — no break — falls through to case 3’s body: three, then the break stops it. case 4 and default are below the break and never run. Labels are doors; breaks are walls (Lesson 3 §3).
P6 — upper B. Char labels are exact characters: 'B' matches only 'B' — cases are case-sensitive (‘a’ ≠ ‘A’), and matching jumps straight to the label.
P7 — teen. The classic. 13 <= age evaluates first → (13 <= 45) is true, converted to 1 in the next comparison; 1 <= 19 is true → the whole thing is true. Age 45 is “teen”. The fix is age >= 13 && age <= 19; the full autopsy is D9.
P8 — allowed. && binds tighter than ||, so the condition is age < 18 || (age > 65 && hasPass) — not (age < 18 || age > 65) && hasPass. With age 16: age < 18 is true, so the OR is true regardless of the second half → allowed. A minor walks through the “adults with pass” door because the parentheses nobody wrote grouped differently than intended. Parenthesise mixed AND/OR (Lesson 2 §4).
P9 — PASS then 1. Line 1: the ternary picks "PASS" (55 ≥ 40) — note the parentheses around the whole ?: are what let it sit inside a << chain (Lesson 3 §7, S7). Line 2: cout prints bool as 1/0 by default — the words true/false need the stream trick from I/O Lesson 1 §7. Both lines say the same thing; only one says it in English.
P10 — no average. count != 0 is false → && short-circuits: the right side (total / count) is never evaluated, so no division by zero ever happens. The guard-then-use ordering isn’t just style — it’s the mechanism that makes the E4-style guard safe even inside one condition. || short-circuits the same way (stops at the first true).