Exercises — Decision Making
How to work: write your answer and dry-run it before opening any answer. Stars: ★ recall · ★★ apply · ★★★ design. Selected answers (E1–E10, and starred hints for later items) are in a collapsed block at the bottom of this page — the Try-It-Yourself rule from the module home applies to every one.
Setup for code exercises: every program compiles with g++ -std=c++17 -Wall -Wextra eNN.cpp -o eNN (see the toolchain notes).
Part A — One-condition decisions (★)
E1 — Pass/fail. Read marks (0–100). Print PASS when marks are 40 or more, otherwise FAIL. Then print Checked. on its own line either way.
E2 — Adult gate. Read an age. Print Adult if 18 or more, Minor otherwise. Then add: if the age is exactly 17, additionally print One year to go.
E3 — Negative guard. Read a number. If it is negative, print Negative input and stop the program with return 1;. Otherwise print OK: and the number.
E4 — Zero division guard. Read integers total and count. If count is 0, print Cannot divide by zero.; otherwise print the integer quotient and remainder (total / count, total % count — recall Foundations Lesson 3).
E5 — Coin doubles. Read a number. If it is positive, print the number doubled; otherwise print the number unchanged. One decision, two outputs.
Part B — else-if ladders (★–★★)
E6 — Grade ladder. Read marks (0–100) and print the grade with a single ladder: A ≥ 80, B ≥ 70, C ≥ 60, D ≥ 40, else F. Print the letter only, no newline gymnastics needed.
E7 — BMI bands. Read weight (kg) and height (m). Compute bmi = weight / (height * height) as a double and classify: < 18.5 Underweight, < 25 Normal, < 30 Overweight, else Obese. Print the band and the BMI with two decimal places (fixed/setprecision — I/O Lesson 1 §6).
E8 — Day type. Read a day number 1–7 (Mon=1). Print Working day for 1–5, Weekend for 6–7, and Invalid day for anything else. One ladder, three outcomes.
E9 — Ticket bands. Read age. Prices: under 12 → Child 300, 12–17 → Teen 450, 18–59 → Adult 700, 60+ → Senior 350. Print e.g. Adult 700. Then state (in a comment) which boundary values your ladder places in which band, and why 12 and 17 land where they do.
E10 — Temperature advisory. Read a Celsius temperature as a double (integer divisions off!). Print: ≥ 40 Heat warning, ≥ 30 Hot, ≥ 20 Pleasant, ≥ 10 Cool, < 10 Cold.
Part C — Compound conditions (★★)
E11 — Range check. Read a number and print In range when it is between 10 and 20 inclusive, else Out of range. Then answer in a comment: does your condition admit 10? 20? Why?
E12 — Login rule. Read a username (std::string) and a 4-digit pin (int). Print Welcome when username is "admin" and pin is 1234; otherwise Access denied. Note the I/O whitespace rules: >> reads one word for the string.
E13 — Discount rule. Read isMember (1/0) and total. Print Discount applied when the customer is a member and total is more than 500; else Full price. Keep the message decision in one if-else.
E14 — Seasons two ways. Read a month number 1–12. Print the season (12/1/2 Winter, 3–5 Spring, 6–8 Summer, 9–11 Autumn, else Invalid month) twice: once with an else-if ladder using ||, once with a switch using stacked cases. Both must produce identical output for every month 0–13.
E15 — Triangle validity. Read three sides. Print Valid triangle when all three are positive and the sum of any two is greater than the third (three checks joined by &&), else Invalid.
E16 — Leap year, first attempt. Read a year and print Leap when it is divisible by 4, else Not leap. (Save your answer — C12 extends this to the full rule.)
E17 — Overlap check. Read two time slots as start/end hour pairs (s1 e1 s2 e2, each 0–23). Print Overlap when one slot starts before the other ends and vice versa: (s1 < e2 && s2 < e1), else Free. Test with slots that merely touch (one ends where the next begins) — is touching an overlap per your formula?
E18 — XOR, the exclusive or. Read two answers a and b as 1/0 booleans. Print Exactly one when exactly one of them is true, else Both or neither. One comparison, no nested ifs: recall Lesson 2 §6 (a != b when both are bool).
E19 — Military time check. Read hours and minutes as two integers. Print Valid time when hours are 0–23 and minutes 0–59, else Invalid time. Then re-do it with a single compound condition and confirm both versions agree on (24, 0), (23, 60), (0, 0), (-1, 30).
Part D — Validation and boundaries (★★–★★★)
E20 — Three-guard program. Read age, weight, and haemoglobin (the Lesson 4 example — but write it yourself before rereading the worked solution). Reject out-of-range inputs individually (return 1 after each message), then classify exactly as the worked example does. Your output text may differ; the branch structure may not.
E21 — Boundary line-up. A rule says “students with more than 60 marks get a scholarship.” For each of 59, 60, 61: state whether your if (you choose the comparison) admits the student. Then rewrite the condition the opposite way (< vs >= family) without changing which values qualify, and state the flip rule from Lesson 2 §5 you used.
E22 — Band-edge owner. Marks ladder with bands A ≥ 80, B ≥ 70: which band owns exactly 70 in your ladder? Prove it by dry-running 69, 70, 71 through your code and recording the branch each takes. Then move the boundary deliberately (change >= 70 to > 70) and list which test values change verdicts.
E23 — Validation loop, one pass. Read marks; if they are outside 0–100 print Invalid and return 1. Combine this with E6’s ladder so invalid input never reaches the grading ladder. Test: −5, 0, 39, 40, 100, 101 — record each output.
E24 — Weekday menu. Read a day number 1–7 and use a switch to print the day’s schedule: 1–5 Classes, 6 Lab cleanup, 7 Off, default Invalid day. Then convert it to an else-if ladder. In a comment: which version would you extend first if the schedule became per-day different, and why?
E25 — Fee rule stack. A course fee is 15000. Rules: (a) full fee with no discount; (b) 10% discount when the student is a merit scholar or the fee is paid within the first week; (c) an additional 5% (on the already-discounted fee) when both are true. Read isMerit (1/0) and paidEarly (1/0), compute and print the fee with two decimals. Design the decisions so both-true (rule c) really stacks — test with both-false, each-alone, and both-true; the both-true answer is 12825.00.
Selected answers
Answers to E1–E10 (attempt first!)
E1. if (marks >= 40) { std::cout << "PASS\n"; } else { std::cout << "FAIL\n"; } std::cout << "Checked.\n"; — the final line is outside the if-else. Boundary: 40 → PASS.
E2. Two separate decisions, not a ladder — the “exactly 17” message is additional, so it can’t be an else of the Adult/Minor fork:
if (age >= 18) std::cout << "Adult\n"; else std::cout << "Minor\n";
if (age == 17) std::cout << "One year to go.\n";
(braces preferred per Lesson 1 §7; shown tight for space.)
E3. if (number < 0) { std::cout << "Negative input\n"; return 1; } std::cout << "OK: " << number << '\n'; — no else needed: after the early return, what follows is the other case.
E4. if (count == 0) { std::cout << "Cannot divide by zero.\n"; return 1; } std::cout << total / count << " " << total % count << '\n'; — integer division on purpose; count must be int.
E5. if (n > 0) { std::cout << n * 2 << '\n'; } else { std::cout << n << '\n'; } — zero and negatives print unchanged (“positive” is strict >; 0 is not positive).
E6. Ladder exactly as Lesson 1 §5; final else catches 0–39. Edges: 80→A, 79→B, 70→B, 69→C, 60→C, 59→D, 40→D, 39→F.
E7. bmi = weight / (height * height); with weight/height as double. Ladder: bmi < 18.5 → Underweight; else if (bmi < 25) Normal; else if (bmi < 30) Overweight; else Obese. Print with std::fixed << std::setprecision(2) after #include <iomanip>.
E8. if (day >= 1 && day <= 5) ... else if (day == 6 || day == 7) ... else ... — the range needs &&, the menu needs ||; mixing them wrong is C3.
E9. age < 12 Child; else if (age <= 17) Teen — or else if (age < 18); both own 12–17. 12 lands in Teen only because the first question used < 12 (strict); with <= 12 Child would own 12. 17 is Teen because Adult starts at 18. Every boundary is owned by exactly one band — on purpose.
E10. double throughout; ladder of < rejections, else Cold. Edge owner: 40→Heat warning (first question is temp >= 40), 30→Hot, 20→Pleasant, 10→Cool.
Hints for E11–E25 (no full answers — design these yourself)
- E11 — inclusive is
>=and<=; 10 and 20 both admitted. Then say why. - E12 —
pin == 1234andusername == "admin"; both in one&&. What doespin == 123or"Admin"do? (Case matters.) - E13 —
(isMember == 1 && total > 500); keep it one if-else. Is a member with total exactly 500 discounted? Check your operator against “more than”. - E14 — ladder:
month == 12 || month == 1 || month == 2; switch: stackedcase 12: case 1: case 2:. Identical-output proof: test 0, 1, 2, 3, 12, 13. - E15 — three positivity checks and three triangle inequalities:
a + b > c && a + c > b && b + c > a(positivity folded in). Test 1,2,3 (degenerate — invalid) and 1,1,1 (valid). - E16 —
year % 4 == 0— deliberately incomplete; keep the program for C12. - E17 —
(s1 < e2 && s2 < e1); touching slots giveFreewith strict<— decide which the requirement wants and state it. - E18 —
a != bwith both stored asint1/0 orbool; ifint, compare to 1 after validating. - E19 —
hours >= 0 && hours <= 23 && minutes >= 0 && minutes <= 59; the four test pairs each fail exactly one conjunct. - E20 — ladder order age → weight → hgb; three separate guards before it. Compare against the worked version after your own attempt.
- E21 —
marks > 60admits 61, not 60/59. Flip family:!(marks > 60)≡marks <= 60— state it. - E22 — with
>= 70, band B owns 70. Changing to> 70moves 70 to band C: verdicts change for exactly that one value. - E23 — guard first, ladder after; 101 and −5 die in the guard; 0 → F, 39 → F, 40 → D, 100 → A.
- E24 — switch version stacks
case 1: ... case 5:; ladder uses rangesday >= 1 && day <= 5. Per-day schedules favour the switch (add a case per day); ranges favour the ladder. - E25 — compute
fee = 15000; if (merit || early) fee = fee * 0.90; if (merit && early) fee = fee * 0.95;— two decisions, the second applying on top. 15000 → 13500 (one) → 12825.00 (both). Print withfixed/setprecision(2).