cs-142 — The Tallied Vote

FieldValue
idcs-142
difficultyBeginner
topicsaggregation, communication, data
lecturelecture-09
estimated time5-minute attempt + 10-minute discussion
prerequisitesnone
objectivetally a small ballot exactly and report the result without over-claiming
solutionheld by the instructor; discussed after the attempt

Problem

Eleven committee members each wrote one name on a slip:

Zoe   Amir  Zoe   Bea   Amir  Cal   Zoe
Bea   Cal   Amir  Zoe

Your deliverables:

  1. The tally per candidate.
  2. The winner (most slips) and the runner-up.
  3. The share of slips for the top two, as percentages of the valid ballots, to one decimal place.
  4. The one-sentence announcement to the committee that reports the result without over-claiming (what does 11 slips NOT tell you?).

If the problem is ambiguous anywhere, state the assumption you are making and carry on — a stated assumption is part of a good answer.

Examples

Solve for the worked instance first. Then ask what would change if one number, name, or condition were replaced by something stranger.

What to notice

Discussion starter

After the solution is revealed, the class spends five minutes on this prompt: "The committee chair asks you to announce 'Zoe wins by a landslide.' Redraft the sentence so it stays true with the same numbers."

Constraints and assumptions

Hints and extension