cs-139 — The Attendance Frame

FieldValue
idcs-139
difficultyIntermediate
topicsbias, evaluation, stakeholders
lecturelecture-25
estimated time5-minute attempt + 10-minute discussion
prerequisiteslecture-25 (thinking with data) taken in the same session
objectiveseparate a measurement artifact from a real change by choosing between two frames
solutionheld by the instructor; discussed after the attempt

Problem

The library reports: "Weekday visits fell 20% the week after the deadline-week survey." Two staff proposals:

The visit counts (the log is complete; the difference is the calendar):

Survey week      Mon 520  Tue 540  Wed 500  Thu 530  Fri 510   total 2600
Following week   Mon   0  Tue   0  Wed   0  Thu 490  Fri 480   total  970

The holiday covered Monday–Wednesday of the second week (closed, not a drop in demand).

Your deliverables:

  1. The two frames: total-week comparison versus open-day comparison. Compute both week figures per open day.
  2. What each frame concludes, in one sentence each.
  3. Your verdict with the reasoning rule you would write into the library's reporting policy.
  4. One residual limitation that no frame fixes.

If the problem is ambiguous anywhere, state the assumption you are making and carry on — a stated assumption is part of a good answer.

Examples

Solve for the worked instance first. Then ask what would change if one number, name, or condition were replaced by something stranger.

What to notice

Discussion starter

After the solution is revealed, the class spends five minutes on this prompt: "Draft the one-line caveat that must accompany every weekly visits figure in the library's dashboard, whatever the frame."

Constraints and assumptions

Hints and extension