cs-133 — The Late Bus Ledger

FieldValue
idcs-133
difficultyFoundational
topicsscheduling, communication, assumptions
lecturelecture-15
estimated time5-minute attempt + 10-minute discussion
prerequisiteslecture-05 (remainders and cycles), lecture-06 (traces)
objectivecheck a public claim ("a bus every ten minutes") against schedule arithmetic and report it honestly
solutionheld by the instructor; discussed after the attempt

Problem

The university shuttle poster says: "a bus every ten minutes." The operational facts:

Your deliverables:

  1. The actual depot departure times for the first six scheduled slots.
  2. The gap between consecutive departures for those slots.
  3. The verdict: does "a bus every ten minutes" hold, and if not, exactly which gaps break it?
  4. The two-sentence notice to students that is honest — no cheerleading, no excuses.

If the problem is ambiguous anywhere, state the assumption you are making and carry on — a stated assumption is part of a good answer.

Examples

Solve for the worked instance first. Then ask what would change if one number, name, or condition were replaced by something stranger.

What to notice

Discussion starter

After the solution is revealed, the class spends five minutes on this prompt: "Operations proposes shortening the loop by three minutes instead of buying a third bus. Does the poster claim become true? Show the departure ledger that decides it."

Constraints and assumptions

Hints and extension