cs-117 — The Poster Budget

FieldValue
idcs-117
difficultyBeginner
topicsoptimization, formulation
lecturelecture-30
estimated time5-minute attempt + 10-minute discussion
prerequisitesnone
objectivestate inputs, outputs, and assumptions, then solve a small instance by hand
solutionheld by the instructor; discussed after the attempt

Problem

Maximise posters bought under a budget with two price options and a wall-length constraint. Write objective and constraints formally, then solve by hand.

Your deliverable is the enumerated answer, the space count, and the pruning rule with its measured effect. If the problem is ambiguous anywhere, state the assumption you are making and carry on — a stated assumption is part of a good answer.

Examples

Solve for the worked instance first. Then ask what would change if one number, name, or condition were replaced by something stranger.

What to notice

Discussion starter

After the solution is revealed, the class spends five minutes on this prompt: "Which constraint is cheapest to check first, and why does order matter?"

Constraints and assumptions

Hints and extension