cs-108 — The Sensor Dropout

FieldValue
idcs-108
difficultyAdvanced
topicsanomalies, time series
lecturelecture-27
estimated time5-minute attempt + 10-minute discussion
prerequisitesfunctions, dictionaries, and earlier algorithmic patterns
objectivedesign the algorithm, verify it on edges, and argue correctness or trade-offs
solutionheld by the instructor; discussed after the attempt

Problem

Temperature sensor with gaps and spikes. Distinguish dropout vs anomaly, impute or flag, and show how each choice changes a downstream average.

Your deliverable is the stated assumptions, the gap rule (missing vs zero vs delayed) made precise, and one record where the rule choice changes the conclusion. If the problem is ambiguous anywhere, state the assumption you are making and carry on — a stated assumption is part of a good answer.

Examples

Solve for the worked instance first. Then ask what would change if one number, name, or condition were replaced by something stranger.

What to notice

Discussion starter

After the solution is revealed, the class spends five minutes on this prompt: "Which assumption would you attack first if you had to argue the other side?"

Constraints and assumptions

Hints and extension