cs-101 — The Late Bus Frequency

FieldValue
idcs-101
difficultyBeginner
topicsprobability, frequencies
lecturelecture-26
estimated time5-minute attempt + 10-minute discussion
prerequisitesnone
objectivestate inputs, outputs, and assumptions, then solve a small instance by hand
solutionheld by the instructor; discussed after the attempt

Problem

From two weeks of bus logs, estimate the probability of a late arrival, and of two lates in a row (testing independence empirically).

Your deliverable is the count (or probability) with the sample space stated, the case analysis, and a brute-force check for a small instance. If the problem is ambiguous anywhere, state the assumption you are making and carry on — a stated assumption is part of a good answer.

Examples

Solve for the worked instance first. Then ask what would change if one number, name, or condition were replaced by something stranger.

What to notice

Discussion starter

After the solution is revealed, the class spends five minutes on this prompt: "When is enumeration a legitimate answer rather than a crutch?"

Constraints and assumptions

Hints and extension