cs-095 — The Prerequisite Chain

FieldValue
idcs-095
difficultyIntermediate
topicsgraphs, topological order
lecturelecture-24
estimated time5-minute attempt + 10-minute discussion
prerequisitesloops, lists, and tracing from lectures 1-6
objectivechoose the technique, trace it faithfully, and defend the boundary behaviour
solutionheld by the instructor; discussed after the attempt

Problem

Order courses so prerequisites come first (topological sort). Detect cycles as 'impossible semester plans'.

Your deliverable is the graph model (nodes/edges), the traversal result for the worked instance, and the unreachable-case behaviour. If the problem is ambiguous anywhere, state the assumption you are making and carry on — a stated assumption is part of a good answer.

Examples

Solve for the worked instance first. Then ask what would change if one number, name, or condition were replaced by something stranger.

What to notice

Discussion starter

After the solution is revealed, the class spends five minutes on this prompt: "Where does the algorithm report 'unreachable', and what should the user see?"

Constraints and assumptions

Hints and extension