cs-094 — The Campus Walk

FieldValue
idcs-094
difficultyFoundational
topicsbfs, shortest path
lecturelecture-24
estimated time5-minute attempt + 10-minute discussion
prerequisiteslectures 1-2 (problem framing, precise pseudocode)
objectiverecognise the pattern, translate it into precise steps, and trace it correctly
solutionheld by the instructor; discussed after the attempt

Problem

Fewest corridors between two rooms. Breadth-first search on a small grid/campus map; levels as distances.

Your deliverable is the graph model (nodes/edges), the traversal result for the worked instance, and the unreachable-case behaviour. If the problem is ambiguous anywhere, state the assumption you are making and carry on — a stated assumption is part of a good answer.

Examples

Solve for the worked instance first. Then ask what would change if one number, name, or condition were replaced by something stranger.

What to notice

Discussion starter

After the solution is revealed, the class spends five minutes on this prompt: "Re-model the same situation with different nodes: what question does the new graph answer?"

Constraints and assumptions

Hints and extension