cs-088 — The Tower Steps

FieldValue
idcs-088
difficultyExpert
topicsrecursion, dp preview
lecturelecture-22
estimated time5-minute attempt + 10-minute discussion
prerequisitesthe full Block I-III toolbox and proof-shaped reasoning
objectivemake and justify design decisions where the method itself is the challenge
solutionheld by the instructor; discussed after the attempt

Problem

Count ways to climb n steps taking 1 or 2 at a time. Recursion tree shows re-computation; memoisation saves it. The bridge to dynamic programming.

Your deliverable is the recurrence with base cases, the answer for the worked instance, and the memoised (or tabulated) version. If the problem is ambiguous anywhere, state the assumption you are making and carry on — a stated assumption is part of a good answer.

Examples

Solve for the worked instance first. Then ask what would change if one number, name, or condition were replaced by something stranger.

What to notice

Discussion starter

After the solution is revealed, the class spends five minutes on this prompt: "State f(k)'s meaning in words; is your statement precise enough to code from?"

Constraints and assumptions

Hints and extension