cs-079 — The Meeting Triple

FieldValue
idcs-079
difficultyIntermediate
topicsbrute force, combinations
lecturelecture-20
estimated time5-minute attempt + 10-minute discussion
prerequisitesloops, lists, and tracing from lectures 1-6
objectivechoose the technique, trace it faithfully, and defend the boundary behaviour
solutionheld by the instructor; discussed after the attempt

Problem

Find three people who can all attend the same slot from availability masks. Enumerate triples systematically and prune; estimate cost honestly.

Your deliverable is the enumerated answer, the space count, and the pruning rule with its measured effect. If the problem is ambiguous anywhere, state the assumption you are making and carry on — a stated assumption is part of a good answer.

Examples

Solve for the worked instance first. Then ask what would change if one number, name, or condition were replaced by something stranger.

What to notice

Discussion starter

After the solution is revealed, the class spends five minutes on this prompt: "Which constraint is cheapest to check first, and why does order matter?"

Constraints and assumptions

Hints and extension