cs-078 — Perfect Numbers

FieldValue
idcs-078
difficultyFoundational
topicsbrute force, divisors
lecturelecture-20
estimated time5-minute attempt + 10-minute discussion
prerequisiteslectures 1-2 (problem framing, precise pseudocode)
objectiverecognise the pattern, translate it into precise steps, and trace it correctly
solutionheld by the instructor; discussed after the attempt

Problem

Find all perfect numbers below 10000 (equal to sum of proper divisors). Brute force with a smarter divisor bound; measure the improvement.

Your deliverable is the enumerated answer, the space count, and the pruning rule with its measured effect. If the problem is ambiguous anywhere, state the assumption you are making and carry on — a stated assumption is part of a good answer.

Examples

Solve for the worked instance first. Then ask what would change if one number, name, or condition were replaced by something stranger.

What to notice

Discussion starter

After the solution is revealed, the class spends five minutes on this prompt: "Double the input size: is this still acceptable? Show the arithmetic."

Constraints and assumptions

Hints and extension