cs-059 — The Committee Draw

FieldValue
idcs-059
difficultyIntermediate
topicscombinations, probability
lecturelecture-15
estimated time5-minute attempt + 10-minute discussion
prerequisitesloops, lists, and tracing from lectures 1-6
objectivechoose the technique, trace it faithfully, and defend the boundary behaviour
solutionheld by the instructor; discussed after the attempt

Problem

From 6 CS and 4 DS students, a 4-person committee must include at least one of each programme. Count compositions; then compute the probability a random draw satisfies it.

Your deliverable is the count (or probability) with the sample space stated, the case analysis, and a brute-force check for a small instance. If the problem is ambiguous anywhere, state the assumption you are making and carry on — a stated assumption is part of a good answer.

Examples

Solve for the worked instance first. Then ask what would change if one number, name, or condition were replaced by something stranger.

What to notice

Discussion starter

After the solution is revealed, the class spends five minutes on this prompt: "When is enumeration a legitimate answer rather than a crutch?"

Constraints and assumptions

Hints and extension