cs-055 — The Parameter Jungle

FieldValue
idcs-055
difficultyIntermediate
topicsfunctions, defaults, mutation
lecturelecture-14
estimated time5-minute attempt + 10-minute discussion
prerequisitesloops, lists, and tracing from lectures 1-6
objectivechoose the technique, trace it faithfully, and defend the boundary behaviour
solutionheld by the instructor; discussed after the attempt

Problem

A function with a mutable default argument accumulates state across calls. Diagnose, fix, and generalise the lesson to API design.

Your deliverable is the function list with contracts, the composed driver, and one input per function that exercises its edge. If the problem is ambiguous anywhere, state the assumption you are making and carry on — a stated assumption is part of a good answer.

Examples

Solve for the worked instance first. Then ask what would change if one number, name, or condition were replaced by something stranger.

What to notice

Discussion starter

After the solution is revealed, the class spends five minutes on this prompt: "Where would this decomposition crack if the input format changed?"

Constraints and assumptions

Hints and extension