cs-047 — The Swap That Wasn't

FieldValue
idcs-047
difficultyIntermediate
topicsdebugging, tuples, references
lecturelecture-12
estimated time5-minute attempt + 10-minute discussion
prerequisitesloops, lists, and tracing from lectures 1-6
objectivechoose the technique, trace it faithfully, and defend the boundary behaviour
solutionheld by the instructor; discussed after the attempt

Problem

An attempted in-place swap of list elements fails silently for one ordering. Trace it, find why, and enumerate every ordering in a test.

Your deliverable is the minimal failing input, the ranked hypotheses, the located mechanism, the minimal fix, and a regression test. If the problem is ambiguous anywhere, state the assumption you are making and carry on — a stated assumption is part of a good answer.

Examples

Solve for the worked instance first. Then ask what would change if one number, name, or condition were replaced by something stranger.

What to notice

Discussion starter

After the solution is revealed, the class spends five minutes on this prompt: "Write the one-line commit message that explains the mechanism, not the symptom."

Constraints and assumptions

Hints and extension