cs-043 — Rotate and Roll

FieldValue
idcs-043
difficultyIntermediate
topicslists, rotation
lecturelecture-11
estimated time5-minute attempt + 10-minute discussion
prerequisitesloops, lists, and tracing from lectures 1-6
objectivechoose the technique, trace it faithfully, and defend the boundary behaviour
solutionheld by the instructor; discussed after the attempt

Problem

Rotate a list by k positions (left or right) without extra library calls. Handle k larger than the length; connect rotation to slicing.

Your deliverable is the rearranged list for the worked instance, the slice arithmetic, and a note on what aliasing would change. If the problem is ambiguous anywhere, state the assumption you are making and carry on — a stated assumption is part of a good answer.

Examples

Solve for the worked instance first. Then ask what would change if one number, name, or condition were replaced by something stranger.

What to notice

Discussion starter

After the solution is revealed, the class spends five minutes on this prompt: "Find the smallest change to the task that makes the slice solution wrong."

Constraints and assumptions

Hints and extension