cs-042 — Deduplication Patterns

FieldValue
idcs-042
difficultyFoundational
topicslists, uniqueness
lecturelecture-11
estimated time5-minute attempt + 10-minute discussion
prerequisiteslectures 1-2 (problem framing, precise pseudocode)
objectiverecognise the pattern, translate it into precise steps, and trace it correctly
solutionheld by the instructor; discussed after the attempt

Problem

Remove duplicates three ways: preserving order with a seen-set, via sorting, and the naive quadratic way. Compare and test all three.

Your deliverable is the three deduplication strategies applied to the worked instance, a one-line cost statement for each, and one input where the sorted approach visibly changes the result. If the problem is ambiguous anywhere, state the assumption you are making and carry on — a stated assumption is part of a good answer.

Examples

Solve for the worked instance first. Then ask what would change if one number, name, or condition were replaced by something stranger.

What to notice

Discussion starter

After the solution is revealed, the class spends five minutes on this prompt: "When is the extra memory of slicing worth it, and when would you insist on in-place?"

Constraints and assumptions

Hints and extension