cs-036 — Rainfall Windows

FieldValue
idcs-036
difficultyAdvanced
topicsaggregation, windows
lecturelecture-09
estimated time5-minute attempt + 10-minute discussion
prerequisitesthe full Block I-III toolbox and proof-shaped reasoning
objectivemake and justify design decisions where the method itself is the challenge
solutionheld by the instructor; discussed after the attempt

Problem

For a window of the last k days, report the running maximum without re-summing the whole window each time. A gentle sliding-window preview.

Your deliverable is the computed aggregates for the worked instance, the accumulator update rules, and one test input that breaks a careless initialisation. If the problem is ambiguous anywhere, state the assumption you are making and carry on — a stated assumption is part of a good answer.

Examples

Solve for the worked instance first. Then ask what would change if one number, name, or condition were replaced by something stranger.

What to notice

Discussion starter

After the solution is revealed, the class spends five minutes on this prompt: "Where exactly would this solution break first if the input grew to a million items — and would anything break at all?"

Constraints and assumptions

Hints and extension