cs-031 — Black Box vs White Box

FieldValue
idcs-031
difficultyIntermediate
topicstesting, coverage
lecturelecture-08
estimated time5-minute attempt + 10-minute discussion
prerequisitesloops, lists, and tracing from lectures 1-6
objectivechoose the technique, trace it faithfully, and defend the boundary behaviour
solutionheld by the instructor; discussed after the attempt

Problem

Given a small function with tricky internal branches, compare the tests a black-box tester writes with the tests the code's structure demands. Which defect escapes which suite?

Your deliverable is the complete test table with expected outputs, the boundary rationale, and the automated run result. If the problem is ambiguous anywhere, state the assumption you are making and carry on — a stated assumption is part of a good answer.

Examples

Solve for the worked instance first. Then ask what would change if one number, name, or condition were replaced by something stranger.

What to notice

Discussion starter

After the solution is revealed, the class spends five minutes on this prompt: "What would a 'suite' that can never fail tell you about its tests?"

Constraints and assumptions

Hints and extension