cs-027 — The Ghost Duplicate

FieldValue
idcs-027
difficultyIntermediate
topicsdebugging, state
lecturelecture-07
estimated time5-minute attempt + 10-minute discussion
prerequisitesloops, lists, and tracing from lectures 1-6
objectivechoose the technique, trace it faithfully, and defend the boundary behaviour
solutionheld by the instructor; discussed after the attempt

Problem

A task list occasionally shows one task twice after edits. Reason about shared references / aliasing as the cause and design the experiment that proves it.

Your deliverable is the minimal failing input, the ranked hypotheses, the located mechanism, the minimal fix, and a regression test. If the problem is ambiguous anywhere, state the assumption you are making and carry on — a stated assumption is part of a good answer.

Examples

Solve for the worked instance first. Then ask what would change if one number, name, or condition were replaced by something stranger.

What to notice

Discussion starter

After the solution is revealed, the class spends five minutes on this prompt: "Write the one-line commit message that explains the mechanism, not the symptom."

Constraints and assumptions

Hints and extension