cs-026 — The Off-by-One Invoice

FieldValue
idcs-026
difficultyFoundational
topicsdebugging, boundaries
lecturelecture-07
estimated time5-minute attempt + 10-minute discussion
prerequisiteslectures 1-2 (problem framing, precise pseudocode)
objectiverecognise the pattern, translate it into precise steps, and trace it correctly
solutionheld by the instructor; discussed after the attempt

Problem

An invoice tool includes one extra row under specific conditions. Use bisection over input shapes to find the boundary condition that triggers the defect.

Your deliverable is the minimal failing input, the ranked hypotheses, the located mechanism, the minimal fix, and a regression test. If the problem is ambiguous anywhere, state the assumption you are making and carry on — a stated assumption is part of a good answer.

Examples

Solve for the worked instance first. Then ask what would change if one number, name, or condition were replaced by something stranger.

What to notice

Discussion starter

After the solution is revealed, the class spends five minutes on this prompt: "Which hypothesis did you rank first, and what evidence moved it down the list?"

Constraints and assumptions

Hints and extension