cs-025 — The Case of the Missing Sales

FieldValue
idcs-025
difficultyBeginner
topicsdebugging, hypotheses
lecturelecture-07
estimated time5-minute attempt + 10-minute discussion
prerequisitesnone
objectivestate inputs, outputs, and assumptions, then solve a small instance by hand
solutionheld by the instructor; discussed after the attempt

Problem

A receipt program prints a total that is too low by exactly one item's price. Form hypotheses, design the minimal reproducing input, and localise the fault.

Your deliverable is the minimal failing input, the ranked hypotheses, the located mechanism, the minimal fix, and a regression test. If the problem is ambiguous anywhere, state the assumption you are making and carry on — a stated assumption is part of a good answer.

Examples

Solve for the worked instance first. Then ask what would change if one number, name, or condition were replaced by something stranger.

What to notice

Discussion starter

After the solution is revealed, the class spends five minutes on this prompt: "Write the one-line commit message that explains the mechanism, not the symptom."

Constraints and assumptions

Hints and extension