cs-008 — Shuffling a Playlist

FieldValue
idcs-008
difficultyExpert
topicspseudocode, randomness, constraints
lecturelecture-02
estimated time5-minute attempt + 10-minute discussion
prerequisitesthe full Block I-III toolbox and proof-shaped reasoning
objectivemake and justify design decisions where the method itself is the challenge
solutionheld by the instructor; discussed after the attempt

Problem

Write pseudocode for a shuffle that plays every song exactly once but never two songs by the same artist back-to-back. The interest is in stating constraints and repair steps precisely.

Your deliverable is the stated assumptions, the rule list, the decision for the worked instance, and one contested case. If the problem is ambiguous anywhere, state the assumption you are making and carry on — a stated assumption is part of a good answer.

Examples

Solve for the worked instance first. Then ask what would change if one number, name, or condition were replaced by something stranger.

What to notice

Discussion starter

After the solution is revealed, the class spends five minutes on this prompt: "Which assumption would you attack first if you had to argue the other side?"

Constraints and assumptions

Hints and extension