cs-002 — The Elevator Debate

FieldValue
idcs-002
difficultyFoundational
topicsdecomposition, modeling
lecturelecture-01
estimated time5-minute attempt + 10-minute discussion
prerequisiteslectures 1-2 (problem framing, precise pseudocode)
objectiverecognise the pattern, translate it into precise steps, and trace it correctly
solutionheld by the instructor; discussed after the attempt

Problem

An office elevator stops at every requested floor in the order buttons were pressed. Decide the total travel time for a list of floor requests, then debate a better ordering policy.

Your deliverable is the stated assumptions, the rule list, the decision for the worked instance, and one contested case. If the problem is ambiguous anywhere, state the assumption you are making and carry on — a stated assumption is part of a good answer.

Examples

Solve for the worked instance first. Then ask what would change if one number, name, or condition were replaced by something stranger.

What to notice

Discussion starter

After the solution is revealed, the class spends five minutes on this prompt: "Which assumption would you attack first if you had to argue the other side?"

Constraints and assumptions

Hints and extension